New York · Solar

How much of an active farm in Glen can a solar project use?

Sources checked

Check the acreage parcel by parcel

Glen’s 2022 solar law limits a utility-scale solar system proposed on an active farm in the state-certified agricultural district to 20% of any farmed parcel, capped at 10 acres. Before signing, ask for a layout and acreage calculation for each parcel. If the developer expects to exceed the limit under a state siting permit, ask for the final permit provision and the parcel list it applies to.

A single farm can span several tax parcels. The developer may want to reserve fields for several possible layouts while you or a tenant still need to plant, harvest and reach the acreage outside the project.

Confirm which parcels the farm rule covers

Start with the tax map number, survey and farm operator’s field map. Ask Montgomery County Planning to confirm the current certified agricultural district boundary. Give the Town of Glen clerk the parcel numbers and ask for the current solar law and any amendments. Have the town confirm how it applies the active-farm rule to your parcel and which acreage and project features it counts.

If the town confirms a 40-acre farmed parcel as the basis for the calculation, 20% is eight acres. For an 80-acre farmed parcel, 20% is 16 acres and the 10-acre ceiling controls. Section 5(4) also calls for siting arrays to avoid prime farmland soils to the extent feasible. Ask the developer to put the prime-soil areas and proposed arrays on the same drawing.

Sources Town of Glen Local Law 5 of 2022, §§ 5(2), 5(4) and 5(6) · New York Agriculture and Markets, Montgomery County agricultural district map and contact · Town of Glen Clerk

Ask for the acreage behind each line on the map

Ask the developer to show these figures for the same version of the layout. If a later drawing shifts a road or enlarges a pad, ask for the calculation and your agreement exhibit to be updated together.

Figure on the proposalWhat to ask for
Farmed-parcel occupation under § 5(4)The parcel number, acreage used as the basis for the calculation and the areas counted toward the occupation limit. Ask the developer and reviewing authority to explain how they are treating any roads, pads and other facilities.
Solar lot coverage under § 5(2), paragraph cThe separate lot coverage calculation. Glen’s law illustrates this calculation using the projected area of the panels.
Acres and rights in your option or leaseA dated exhibit showing the option boundary, proposed long-term lease area, temporary ground disturbance and any separate access, cable or drainage rights. Ask which lanes and gates will stay available for farm equipment.

Sources Town of Glen Local Law 5 of 2022, §§ 5(2), 5(4) and 5(6)

Find your parcel in any state relief the developer cites

For a project under Article VIII, New York’s Office of Renewable Energy Siting and Electric Transmission can decline to apply a local law in whole or in part if it makes the finding required by Public Service Law § 142(5). Ask whether the developer has requested relief and whether the office has granted it. A developer’s application can help you find the request. The final permit gives the office’s decision.

In the January 27, 2026 final siting permit for the 250-megawatt Mill Point Solar I project, § 3(a)(4) granted limited relief from the acreage clause of Glen’s § 5(4). It points to Appendix 24-5, Table 4, docket item 133. The permit uses Table 3 for separate relief from the solar lot coverage provision. Look up your tax map number and ask the developer to show where relief was requested and granted for that parcel and layout. Check the docket for later filings or orders if the developer says the layout or parcel boundaries have changed.

Sources New York Public Service Law § 142(5), local law findings · Mill Point Solar I final siting permit, §§ 3(a)(3)–(4), 4.1(g) and 5 · New York Department of Public Service, Mill Point Solar I docket 23-02972

Agree on which acres the option can hold

Say the offer would reserve a 40-acre farmed parcel and the first layout shows 12 acres counted toward the farm occupation limit. If the town confirms an eight-acre limit and the proposal has no applicable relief, ask for a drawing that fits within eight acres. Compare it with the relief-dependent drawing before agreeing to tie up more ground. A smaller layout can still place a gate or road where it cuts off a field you plan to keep farming.

Take both drawings and the proposed agreement to your attorney. If the offer depends on relief, discuss making continued control of the extra acreage contingent on a written decision that covers your parcel and a dated plan you have reviewed.

  • Mark retained fields, gates, equipment routes and tenant access on the signed exhibit.
  • Set a date to deliver the decision and revised exhibit. Agree when the option releases acreage the developer drops or cannot use.
  • Check whether a release also clears related access rights and any recorded option memorandum, and identify who prepares and records the release.
  • Agree when possession can start and what notice you and the farm operator get before entry affects planting or harvest. If the agreement uses state construction clearance as a trigger, ask which notice and drawing cover work on your land.

Sources Town of Glen Local Law 5 of 2022, §§ 5(2), 5(4) and 5(6) · Mill Point Solar I final siting permit, §§ 3(a)(3)–(4), 4.1(g) and 5

Common questions

Does signing a 40-acre option give the developer 40 acres of approved solar area?

The option describes the rights you grant while the developer evaluates the site. Ask for the acres counted under the town rule, any written relief and the land the developer would occupy long term before settling the lease exhibit.

Can I average the acreage limit across two farmed parcels?

Glen’s § 5(4) states the cap for each farmed parcel. Ask the town to confirm the parcel boundaries and calculate each parcel separately before relying on an overall farm total.

Does the Mill Point Solar I permit cover an added parcel?

Ask which state decision covers the added parcel and the proposed acreage. The January permit cross-references Table 4 of Appendix 24-5. Ask for the permit and relevant exhibit, or a later state decision, together with the corresponding dated plan.

Sources