Landowner guide

Plan farm crossings before solar construction in New York

A solar access road through a working field can change how equipment and livestock reach the land on either side. Review the crossing on a plan with the farmer and project team before construction begins.

The short answer

Mark the farm's gates, routes, largest equipment and drainage on a map and ask the project team to show proposed roads and crossings. New York agriculture guidance addresses access roads outside the security fence in agricultural fields, but the project's permits, approved plans and agreement determine what applies to your site.

Put the farm and project routes on one map

With the farm operator, mark field entrances, gates, livestock movements, driveways, ditches and areas that must remain accessible. Note the width and turning needs of the largest equipment, seasonal movements and any alternate route. Ask for the proposed permanent and temporary roads, fencing, staging and construction limits on the same map.

Walk the intended crossing with the operator and project representative. A road that appears to divide a field on paper may also affect turning space, a gate or drainage. Identify each crossing by location and agree who will update the drawing if the layout changes.

Illustration of a landowner reviewing property plans

Ask how the road will work

The New York Department of Agriculture and Markets' 2019 solar construction mitigation guidelines address access roads outside the generation facility's security fence that pass through agricultural fields. They call for the road surface to be level with the adjacent field; if that design is not feasible, they say roads should allow a farm crossing for specific equipment and livestock while restoring or maintaining original surface drainage patterns.

Ask the project team where each crossing will be, how the intended equipment and livestock can use it, and how ditches, culverts and water movement will be handled. The guidelines are guidance, not proof that any particular design or crossing has been approved. Request the project-specific permit conditions, plans and agreement and ask the team and your adviser how they apply.

Keep a route available during work

A finished crossing does not resolve a temporary closure. Ask when roads, gates or fields may be inaccessible, what notice the operator will receive, and what safe temporary route or schedule is proposed for planting, harvest and livestock movements. Identify a project contact who can respond when an access problem arises.

The guidelines describe an environmental monitor as the agricultural point of contact and call for regular contact with affected farm operators. Ask the project company who fills that role for this project and how to reach that person. Confirm any arrangements for interruptions, damage and compensation in the agreement with your adviser.

Want to ask about your land?

Send the location and what you know. You don’t need a project plan.

Tell us about your land

Record conditions and check the result

Before work, collect the farm lease or access arrangements, project agreement, available plans, photos of gates and drainage, and notes from the operator. Keep dated records of changes and concerns. Ask for an inspection of the crossing and drainage with the project team after construction and a process for reporting problems.

The state guidelines address regrading roads outside the security fence where the environmental monitor determines it necessary for farm equipment crossing, and repair of drainage structures damaged during construction, subject to the described project design. Confirm the actual restoration obligations and contacts in the project's approved documents.

Start a property discussion

Share the property's county, approximate acreage, current agricultural use and the access routes you need to retain. Sunland reviews submissions directly and may follow up; it may contract for a property and assign the agreement to a specialist. An inquiry does not commit you or guarantee a project.

Questions landowners ask

Does a farm crossing have to be at a particular gate?

The guidance does not establish a crossing location for your property. Show the project team the routes and equipment used and review the site-specific plans and agreement.

Does a finished crossing guarantee access throughout construction?

No. Ask for a construction schedule, notice, a safe temporary route where needed and a contact for interruptions.

Are the New York guidelines the same as my project's permit?

No. The guidelines describe mitigation measures; confirm applicable permit conditions, approved plans and contractual obligations for the specific project.

Sources & further reading

Sources checked 2026-11-15. Local rules and program details can change. Check the requirements for the actual project.