Check who will hold the land and why they need it
North Dakota generally bars corporations and LLCs from owning or leasing agricultural land used for farming or ranching, subject to exceptions in Chapter 10-06.1. Section 10-06.1-07 allows a corporation or LLC outside the business of farming or ranching to hold acreage necessary for covered purposes, including commercial development and facility siting. Have counsel assess whether the exception covers the legal entity, the land it proposes to hold and the intended use.
Get the counterparty’s legal name, the proposed deed or solar lease and the latest parcel exhibit. For each field, ask the developer what it needs and when. A 2001 North Dakota Attorney General opinion on a proposed retreat center and golf course treated necessity as a fact-specific question and cautioned that a lengthy development delay could undermine it. Ask what evidence supports holding acreage for later phases and when the parties will revisit that acreage if the schedule slips.
| Record to request | What to compare |
|---|---|
| Draft deed or solar lease and dated parcel exhibit | The exact entity and acreage it would take at closing or lease commencement. |
| Site plan and phase schedule | Which fields are needed for arrays, roads or construction staging and when the company expects to use them. |
| Existing farm lease and proposed interim terms | Which fields can be leased for farming, who can lease them, how the farmer will reach them and how much notice applies before handover. |

Work out farm access before the solar company takes possession
Section 10-06.1-07 requires farmland or ranchland to be available for leasing while the company has no immediate use for it. Eligible lessees include people farming or ranching as sole proprietors or through partnerships, as well as farming or ranching corporations and LLCs that qualify under the chapter. Ask counsel to check the proposed tenant’s legal structure and review any existing farm lease before promising the developer a possession date.
If construction will begin on the west field this year and the east field is scheduled for a later phase, ask the company how an eligible tenant could reach and lease the east field in the meantime. Mark field access and turning space on the exhibit, particularly if the route crosses the first phase. Compare the solar schedule with the farmer’s planting, grazing or harvest dates.
Agree who will arrange the interim lease, collect farm rent and send notice when each phase needs possession. If construction moves into a growing season, spell out when the tenant can finish harvest and who bears losses if early entry damages crops. Ask counsel how those terms should fit with the existing farm lease, the company’s possession rights and the duty to keep land available for lease.
Confirm who will handle the Attorney General report
Under N.D.C.C. § 10-06.1-18, a covered corporation or LLC outside the business of farming or ranching that owns or leases a farmland or ranchland tract larger than 20 acres must report to the Attorney General within 12 months of a covered purchase, sale or surface leasing transaction. Ask the company’s counsel to confirm whether the report applies, what starts the filing period and who will submit it. Keep the report on a separate checklist from the review of the landholding exception and any siting permits.
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landDiscuss your solar land or agreement
Landowners and authorized representatives anywhere in the United States can contact Sunland about a solar land sale, lease or assignment of an existing agreement. Share your role, the general property location and the type of transaction you’re considering. Keep field maps, farm leases and proposed contracts for private follow-up.
Questions landowners ask
Can the current farm tenant keep farming until solar construction starts?
Ask counsel to review the current farm lease, confirm whether the tenant qualifies and compare the lease’s possession and notice terms with the company’s proposed construction dates. Get written terms for each field if access or harvest timing will change.
Does the 20-acre reporting threshold determine whether the solar company can hold farmland?
The acreage threshold belongs to the reporting rule in § 10-06.1-18. Have counsel review whether § 10-06.1-07 or another chapter exception allows the company to own or lease the land, including on tracts of 20 acres or less.
What should I ask for if the company cuts or delays a solar phase?
Ask for a revised parcel exhibit and construction schedule with the acres the company still needs and the dates it anticipates using them. Have counsel revisit the basis for holding the acreage and check whether the interim leasing, field access and notice terms need to change.
Sources & further reading
The North Dakota Century Code and Attorney General letter opinion were checked November 22, 2026. Have North Dakota counsel review the entity, the proposed acreage and the timing in your agreement. Local rules and program details can change. Check the requirements for the actual project.
- North Dakota Century Code §§ 10-06.1-01 and 10-06.1-02, farmland definitions and general restrictions
- North Dakota Century Code § 10-06.1-07, business-purpose exception and interim leasing
- North Dakota Century Code § 10-06.1-18, reporting for covered entities outside farming or ranching
- North Dakota Attorney General Letter Opinion 2001-L-38, necessity and delayed development under § 10-06.1-07