Confirm which lease and facility the law covers
The act took effect November 1, 2025, and applies only to a solar power facility that qualifies as a generation asset. For the lease provisions, the grantee is a party other than an electric utility that leases land and operates the solar facility there. Ask Oklahoma counsel to check the lease dates and amendments, the current operator and the equipment or roads involved.
Collect the signed lease, site plan and any decommissioning plan the operator uses. Mark the roads, fields and other parts of the property that you want addressed. Ask which roads the grantee constructed, which were already there and whether any third party has access or equipment rights.

Identify the work you want the operator to do
Subsection B calls for covered leases to provide for removal of roads the grantee built on the property at the landowner’s request. It also requires filling cavities created by that removal with the same or a similar type of soil as the predominant soil on the property.
Subsection C addresses reasonable landowner requests to take away rocks over 12 inches in diameter excavated during decommissioning or removal, return the land to a tillable state and restore the soil and surface as specified. Use a map and describe the intended use after removal so the operator can identify the work.
Subsection A addresses equipment removal and separately includes landowner requests to remove overhead power or communications lines the grantee installed. The 180th-day deadline in subsection D expressly covers requests under B and C. If your request concerns an overhead line, review its ownership, any easement and the terms and timing that apply with counsel.
Verify both dates and preserve proof of your request
Ask the grantee for the documented date when the facility lost the capability to generate electricity in commercial quantities. If a report shows only a temporary outage or lower output, ask what evidence establishes capability. Keep the grantee’s written notice of intent to decommission and the record showing when you received it. The date printed on the notice can differ from the receipt date.
Check the applicable deadline and the lease’s notice section with counsel. A written request with the marked map, the work requested and proof of delivery helps document what you asked for and when. If the property is changing hands, give the buyer the notice and date records and confirm who can make or follow up on the request.
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landDescribe the restoration question when you inquire
Sunland welcomes nationwide inquiries from landowners and authorized representatives about solar land sales, leases and assignments of existing agreements. Share the general location, your role and which road or restoration issue you are reviewing. Keep signed leases, written notices and detailed site records for private review.
Questions landowners ask
Which date controls if the written notice comes after the facility loses generating capability?
For a covered request under subsection B or C, use the later date. In that sequence, the statutory clock runs from the date the landowner receives the grantee’s written notice of intent to decommission.
What if the road was there before the solar project?
Subsection B addresses roads the grantee constructed. Check the original site records, lease and other access rights to see how they address the road you want removed.
What should I keep if I sell before decommissioning is complete?
Keep the lease and map, the notice and its receipt date, evidence of the facility’s loss of capability, and any requests and replies. Have counsel confirm who handles pending requests and future notices after closing.
Sources & further reading
Oklahoma’s current statutes and enacted law were checked November 21, 2026. Confirm the dates, facility, lease and applicable notice requirements for your property. Local rules and program details can change. Check the requirements for the actual project.