Ask what the project actually needs
Request the water demand by phase and purpose: construction, ongoing module cleaning, vegetation establishment and any other proposed use. Ask whether the developer will bring its own supply or requests water from a farm well, district connection or another source. Identify the intended users and whether water could be taken offsite.
Do not assume a standard volume or cleaning schedule. The National Renewable Energy Laboratory operations and maintenance guidance discusses site-specific cleaning decisions, including manufacturer recommendations and the economics of soiling. Pacific Northwest National Laboratory describes factors such as rainfall, array tilt and pollutants. Ask the operator for its own proposed method and demand; these sources do not establish the capacity or legal availability of your supply.

Check the supply and retained farm needs
Gather the actual option, lease or amendment, water service agreements, well documents, relevant water entitlement and any district or supplier conditions. With the farm operator, map the source, pump, power, connection, meter, storage, pipes or hoses and access route. Record current and anticipated irrigation, livestock and domestic needs, including seasonal peaks.
Ask counsel and the relevant authority or supplier whether the particular source and proposed project uses are allowed and what approvals or conditions apply. Owning a well or reserving a water right in a lease does not by itself answer that question. Do not promise a quantity or quality until the supply and your obligations are understood.
Set limits, measurement and costs
If you are willing to grant use, ask how the agreement will identify permitted users and purposes, flow and volume limits, applicable time periods, connection location and access. Consider who installs and maintains a meter, how readings are recorded, and what documentation accompanies an invoice. Review separate water, pump electricity, delivery, maintenance and repair costs instead of relying on a general promise to pay utilities.
Historical example: A June 23, 2022 Fresno County solar sublease reserved water rights to the landlord while allowing limited water use for the project. It distinguished construction from operating quantities, restricted uses and included a water-price formula; it also assigned certain delivery-system charges to the landlord and disclaimed guarantees of supply quantity or quality. This is one negotiated agreement: a reservation alone does not resolve use or expenses, and the example does not establish a standard price or allowance.
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landPlan for shortage and end of use
Discuss drought, interruption or equipment failure before a connection is made. What priority, if any, will retained farming have? Who receives notice, decides when project use stops, arranges a substitute supply and pays for damage or repair access? These are matters to negotiate and check against applicable obligations, not automatic rights assumed from this guide.
Ask counsel to reconcile the water terms with access, utilities, noninterference, assignment, default and end-of-term equipment provisions. Compare the final documents with the agreed plan, including removal and restoration responsibilities. Sunland accepts nationwide solar land inquiries; share the property location and a high-level question, and arrange appropriate delivery of sensitive documents.
Questions landowners ask
Does reserving water rights prevent all project use?
Not necessarily. Read the reservation together with any grant of water use and related cost provisions. Ask counsel to explain how your documents operate.
How much water will a solar project use?
Demand depends on the project and its practices. Request quantities by phase and purpose, the proposed source and the basis for the estimate.
Can the project draw from an existing irrigation well?
That depends on the source, proposed use, applicable permissions and agreements. Check with counsel and the relevant authority or supplier before granting access.
Sources & further reading
Sources checked November 19, 2026. The June 23, 2022 Fresno County solar sublease is a historical contract example, not a model term or a statement of water law. Maintenance guidance describes site-specific practices, not a forecast for your property. Local rules and program details can change. Check the requirements for the actual project.
- SEC: Solar Energy System Sublease, June 23, 2022, Section 3
- National Renewable Energy Laboratory: Best Practices for Operation and Maintenance of Photovoltaic and Energy Storage Systems, 3rd edition, Section 5.7
- Pacific Northwest National Laboratory: Solar Photovoltaic Operations and Maintenance Best Practices