Find evidence that the intake actually withdrew water
Look for dated pump logs, meter readings or plant operating records that connect an actual withdrawal on or before July 1, 1989 to the intake the buyer proposes to use. Collect any DEQ correspondence or prior certifications and map the intake, pump house and lines. An installation drawing can establish when equipment was in place. For this exclusion, DEQ also needs evidence of actual withdrawal.
Ask for shutdown records, any written abandonment notice to DEQ and records explaining why pumps or piping were removed or disabled. Under 9VAC25-210-310(A)(1), abandonment occurs when the owner of record or its authorized representative gives DEQ written notice of abandonment, or the owner removes or disables the system intending to end withdrawals permanently. A sale, change in operational control, change in water use or temporary pause leaves the abandonment question to those two tests. Ask DEQ how the records apply to the specific intake.

Give DEQ the proposed cooling demand
Have the buyer’s engineer set out average and peak withdrawals, seasonal changes and the timing of each project phase. Show DEQ the historical volumes alongside the proposed profile and ask whether an increase would require a new Section 401 water quality certification and a VWP permit.
For a permanent system using this exclusion, the owner or operator gives DEQ the existing intake location, its estimated maximum capacity and any other information DEQ requires. DEQ uses the estimate when protecting existing water uses and reviewing new permit applications. Ask DEQ what withdrawal the exclusion would cover for your proposal and have the engineer check what the intake can supply during low flows.
Check the reporting history and planned intake work
Ask for applicable annual withdrawal reports, any filings showing zero withdrawals during shutdown and DEQ correspondence about missing years. Ask DEQ which reporting rules applied and what any gaps mean for resuming service. Missing required reports can affect whether DEQ allows withdrawals to resume without a permit. Review the abandonment facts as well.
Show DEQ which parts of the intake the project would repair, replace or enlarge and whether the work involves dredging, fill or other impacts to surface waters. Associated work can require separate review even if the withdrawal qualifies for the exclusion. Ask whether a maintenance exclusion applies and which state or federal authorizations are needed. VWP applications ordinarily go through the Joint Permit Application process.
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landDecide what the sale, lease or option depends on
Ask DEQ’s Office of Water Withdrawal Permitting what it can confirm in writing for the intake and the proposed operating profile. Have counsel identify which agency response or authorization satisfies your agreement and what happens if a required approval or a reliable supply falls short of the buyer’s schedule.
Check recorded rights to reach the intake, run pipes and operate and maintain the system, particularly where the works cross land you plan to retain or land someone else owns. Put the necessary access rights and responsibility for permits, repairs and operating records in the deal documents.
Discuss a property with a surface water intake
Sunland accepts data center property sale, lease and existing agreement assignment inquiries from owners and authorized representatives across the United States. Share the general location, your role, the proposed transaction and whether the buyer plans to use an existing intake. Keep withdrawal records and agency correspondence for private follow-up.
Questions landowners ask
Does selling the plant or changing the water use count as abandonment?
The rule treats changes in ownership, operational control or water use and temporary pauses as insufficient evidence of abandonment. Check for written notice to DEQ or removal or disabling of the system with intent to end withdrawals permanently.
Does the recorded intake capacity tell me how much cooling water to count on?
The rule treats the capacity estimate as information for DEQ. Ask DEQ how the exclusion applies to the proposed withdrawal and ask the engineer how much water the intake can reliably supply.
What should I ask DEQ if the intake needs repairs?
Show the extent of the proposed work and any effects on surface waters. Ask whether the work qualifies for an exclusion and which approvals the project needs for construction and operation.
Sources & further reading
Sources checked November 22, 2026. Virginia’s rulemaking on grandfathered withdrawals was at the notice stage, with public comments closed November 18. Ask DEQ which rules and agency records apply when your project is reviewed. Local rules and program details can change. Check the requirements for the actual project.
- Code of Virginia § 62.1-44.15:22(B), water withdrawals and the July 1, 1989 exclusion
- 9VAC25-210-310(A), surface water withdrawal exclusions and reporting
- 9VAC25-200-30, water withdrawal reporting applicability and exemptions
- 9VAC25-210-50, activities subject to Virginia Water Protection permit requirements
- 9VAC25-210-60, Virginia Water Protection permit exclusions for associated activities
- 9VAC25-210-80, Joint Permit Application procedures
- Virginia Regulatory Town Hall Action 7107, rulemaking on grandfathered withdrawals