Michigan landowner guide

What should you check before replacement batteries arrive in Bengal Township?

If a battery storage failure required emergency removal at a utility-scale project approved by Bengal Township, Michigan, ask for the Township record before agreeing to extra delivery access, amending the lease or acknowledging a restart milestone. Section 7.03(A)(10)(b) requires revised surety to be posted before new or replacement equipment is provided after the emergency.

Could my land work?

Get the current special use permit and its conditions, the approved decommissioning plan, the original and revised surety instruments and dated confirmation from the Township that the revised surety was posted. Compare the posting date with the proposed delivery schedule. Ask the Township what approvals or permit conditions apply to the specific replacement and have counsel check what your lease already allows.

Confirm which approval governs the site

Clinton County directs Bengal Township zoning inquiries to the Township. Under § 7.02(C), utility-scale battery storage under the Township ordinance requires a special use permit in the I-1 district. Give the Township the project name and parcel number and ask for the permit, approved site plan and any amendments or conditions that govern the proposed work.

Michigan’s Part 8 siting process covers energy storage facilities with at least 50 MW of nameplate capacity and at least 200 MWh of energy discharge capability. An issued Michigan Public Service Commission certificate can preempt more restrictive local requirements. If the operator cites a state certificate, get the certificate and its conditions and confirm which requirements govern the replacement.

Illustration of a land parcel and surrounding landscape

Check what the revised surety covers and when it was posted

The ordinance places proper removal and disposal of the system and damaged equipment around it on the applicant. The applicant also pays for in-kind or equivalent replacement. Section 7.03(A)(10)(b) puts emergency decommissioning costs under the standard decommissioning surety. The ordinance describes the separate decommissioning fund as solely for the Township’s benefit.

Ask the Township to confirm the instrument on file, its amount, the work it covers and the date it was posted. Ask whether the Township considers it sufficient for this replacement. The 125% figure in § 7.03(A)(10)(a) applies to the Township-approved estimate for abandonment security. For the revised surety, get the amount and supporting estimate the Township uses for this project.

Check the equipment and the proposed access

Ask the applicant to identify the removed and proposed equipment and explain the basis for calling the replacement in kind or equivalent. For equivalent equipment, the ordinance requires notice to the Township and additional training provided by the applicant. Ask for the notice and the training arrangements, then check with the Township what records or approvals it expects before installation or restart.

If the operator asks to stage trucks or equipment beyond the leased area, request a marked plan showing the routes and staging limits, with dates for entry and restoration. Have counsel check existing access rights, notice and rent provisions, and who pays for repairs and any ongoing cleanup or restoration. Identify which records and dates support the specific access or restart milestone the operator wants you to acknowledge.

Want to ask about your land?

Send the location and what you know. You don’t need a project plan.

Tell us about your land

Discuss your battery storage property or agreement

Sunland America welcomes inquiries from owners and authorized representatives nationwide about selling or leasing battery storage property or discussing an existing agreement. Share the general location, your role and the decision or deadline you are facing. Keep the permit, surety instruments and signed lease for private review.

Questions landowners ask

When must the revised surety be posted?

Bengal Township requires it before the applicant provides new or replacement equipment after a failure that required emergency removal. Ask the Township for the date the revised surety was posted and compare it with the proposed delivery date.

What changes if the applicant proposes equivalent equipment?

The Township must be notified and the applicant must provide additional training. Ask for the equipment comparison, the Township notice and the training arrangements, along with any project-specific permit or site plan decision.

Can I rely on the revised surety to acknowledge a restart?

Use the revised surety and posting confirmation to verify the security requirement. Check with the Township about the permit and site plan, and have counsel review which conditions your lease sets for the restart milestone.

Sources & further reading

Bengal Township’s August 26, 2026 zoning ordinance, Clinton County’s zoning directory and Michigan’s Part 8 statutes were checked November 22, 2026. Local rules and program details can change. Check the requirements for the actual project.