Build a short evidence file
Collect recent electric bills, the current service agreement, utility correspondence and a site plan. Record the date, issuing party, meter or service location and what each stated number represents. Keep the originals for a private review.
- Past demand: what the facility used during a recorded period.
- Equipment rating: what is shown on a transformer, switchgear or other equipment record.
- Proposed service: what the utility has reviewed or agreed for a defined project and location.
Do not present these different figures as interchangeable. Ask the utility which service terms, studies and changes would apply to the proposed operation.
Account for the rest of the campus
Mark every occupied building and retained operation. Record the power those uses need, who holds the service account, and whether meters and access are shared. If a prospective project needs the available supply, do not assume the remaining buildings can support another tenant without additional review.
For a whole-campus lease, list the costs and duties associated with the unused space: upkeep, security, insurance and the agreed treatment of existing equipment. Compare those obligations with the proposal before relying on future sublease income.
Ask a project-specific utility question
Provide the site location, proposed use, estimated demand and timing, including retained loads. Ask what can be confirmed now, what remains subject to study, and which upgrades, costs or service conditions may apply. Request a dated written response identifying the project it covers.
AEP Ohio, for example, describes its hosting-capacity maps as preliminary screening that does not replace new-load requests or interconnection processes. Its data center tariff page provides a separate process for applicable requests. These are examples from that utility; use the serving utility’s requirements for the actual site.
Review the physical property separately
Power documentation is one part of reuse screening. EPA’s reuse assessment guidance also considers building condition, environmental history, land use and infrastructure. Gather existing reports and ask the relevant professionals what requires further investigation.
Share what you know
Unknown capacity is a reason to identify the missing record, not invent a number. Submit your industrial property with the facts available and explain what still needs confirmation.
Sources
Reviewed November 21, 2026.