Factories · Warehouses · Industrial campuses
Powered industrial
properties wanted
Have an industrial building with substantial electrical infrastructure? Sunland America welcomes sale and lease opportunities across the United States for potential data center and energy infrastructure use.
Submit your propertyStart with the power.
Then consider the property.
We are interested in vacant facilities, operating sites approaching closure, underused buildings and larger campuses. Tell us what is available, who occupies it and what electrical service is documented.
You can submit a whole property or an available portion. If the entire campus must be leased, say so. A proposal may need only part of the building while reserving substantial power, outdoor equipment space and access.
What we will need to understand
- Which power figure is documented and whether it applies to a proposed new use.
- How much power and space existing occupants must retain.
- Building condition, site access and outdoor equipment locations.
- Fiber, cooling, environmental history and local approval questions.
- Sale or lease terms, availability and any restrictions.
Existing electrical equipment does not confirm service for a data center. Suitability, cost and timing require site-specific review.
Prepare the power recordsTell us about your industrial property
Start with the location and the information you already have. Fields marked * are required. Please share documents privately when requested.
A submission does not commit you to a transaction or guarantee an offer.