Solano County, California

Considering battery storage on Solano County land?

Ask for a plan that shows what you would give up, what you could keep using and how the property would be left when the project ends.

Could my land work?

For a Solano County proposal, establish the reviewing authority before evaluating the layout or payments. This guide concerns unincorporated county land. Confirm the applicable battery rules and project route, then review the roads, reserved area and restoration terms with the actual drawing and agreement.

Confirm who reviews the property

The county’s planning FAQ says its zoning rules apply to unincorporated land. For property within city limits, contact the relevant city planning department. A nearby town’s name in an address is not enough to identify the reviewing office.

Ask for the parcel’s actual zoning and the rule the company believes allows its proposed use. Keep a copy of that response. If a map and a written description disagree, have the office explain the difference before relying on either.

Describe the existing use when you ask: a farm, commercial yard, vacant tract or other property. Mention buildings, tenants and entrances that would remain. This helps keep the discussion about your land rather than a general description of storage.

Reference: Solano County: zoning and jurisdiction FAQ · Solano County: planning services and official code link

Model landscape illustration of battery enclosures, an electrical substation and a proposed site layout.

Identify the battery proposal being reviewed

Section 28.83 covers qualifying front-of-the-meter systems of at least one megawatt-hour on unincorporated land and distinguishes behind-the-meter systems serving existing uses. Have the reviewing office confirm the classification of the actual proposal.

Ask the developer whether it proposes a separate grid project or batteries serving your existing activity. Request the project’s power and energy figures and the intended electrical connection. You do not need to choose those figures yourself.

The CEC opt-in program is an optional state route for eligible projects. If the company intends to use it, ask how local requirements will be addressed and which other approvals remain. Do not assume that county review and a state application describe the same approval process.

Reference: Solano County Code: Section 28.83, battery energy storage systems · California Energy Commission: opt-in certification program and FAQ

Compare the roads with the land you would keep

The county code links layout requirements to the proposed technology assessment. Its provisions for systems with a thermal-runaway risk include an encircling 30-foot fire access road with two entrances. Ask which requirements apply to the proposed design.

Put the equipment, roads, gates and retained uses on one drawing. Can you still reach the back of the property? Would deliveries, farming equipment or tenants need to cross a controlled entrance? Identify those conflicts while the plan can still change.

Ask what happens when an entrance is closed for maintenance or an emergency. Who holds keys or access codes, and how would people using the rest of the property be informed? Keep your access rights clear in the agreement.

Include construction routes and temporary work areas. Ask who repairs damaged surfaces, fences or irrigation and when temporary space returns to your use. A project drawing should not leave those areas to an informal understanding.

Reference: Solano County Code: Section 28.83, battery energy storage systems

Put on the same drawingQuestion to resolve
Battery area and roadsWhat land is restricted beyond the equipment?
Retained buildings and usesWhich entrances must stay available?
Construction spaceWhen does it return to your use?
Utility routeWhat rights are needed outside the offered area?

Want to ask about your land?

Send the location and what you know. You don’t need a project plan.

Tell us about your land

Map runoff containment and its upkeep

Solano County requires technical studies to analyze runoff from fire suppression water. A containment system and liner are required if county staff determines they are needed; sizing is informed by the studies and consultation with the county and fire agencies. Ask for the approved plan for this proposal instead of assuming every site needs a basin.

Place any proposed basin, liner and maintenance routes on the same drawing as the battery pad, retained fields, farm entrances and drainage. Ask whether they occupy or affect land outside the lease area, how equipment will reach them, and what access or restrictions remain on the land you keep farming. Compare the drawing with the lease exhibits before agreeing to the footprint.

The code calls for a containment basin filled by rain or floodwater to be emptied the same day. Ask who will check and empty it, handle water under the approved plan, keep records and restore affected land, and who pays for access and maintenance. The incident provision assigns sampling and mitigation costs to the “site owner”; another provision refers to the BESS facility owner. Ask the county and counsel to identify the applicable responsible party and how the agreement allocates private costs; lease wording alone does not settle public duties.

Reference: Solano County Code: Section 28.83, battery energy storage systems

Ask which approval stage has been reached

The November 4, 2025 Board record confirms adoption of the updated battery ordinance. That is a rulemaking decision, not approval of your property.

Section 28.83 separates land-use review from documents needed before building permits and final inspection. Request the actual decisions and outstanding conditions for the site.

Use a short list: the company’s next step, the record supporting it, the expected date and the payment affected by that step. If the company only has an application, have that described plainly rather than calling the project approved.

Ask separately about the electrical connection. What document names the connection point, what work remains and who pays for it? A site decision does not answer whether the connection can be completed on the proposed timetable.

Reference: Solano County: November 4, 2025 battery ordinance adoption record · Solano County Code: Section 28.83, battery energy storage systems

Agree on the condition in which the land comes back

The county’s decommissioning provisions address landowner agreements and financial assurance. Ask for the actual plan and security documents alongside the lease.

Describe what “restored” should mean for your property. Discuss equipment, foundations, roads, cables, drainage and access to the remaining land. What would be removed, what could remain with your agreement and who would complete each task?

Ask who can call on the financial security, what it covers and how its amount is updated. Have your advisers compare it with the obligations owed to you. Avoid treating a mention of a bond as the full answer to restoration costs.

If the project company or property ownership changes, ask how the agreement handles ongoing responsibilities and notices. Keep the company responsible for payments, maintenance and removal identifiable throughout the arrangement.

To begin a conversation with Sunland, send your contact details and the property location. This page selects Solano County and California, and both can be corrected. Add a note about the land you could offer or the part of a proposal you want to understand. Acreage and parcel number are optional.

Reference: Solano County Code: Section 28.83, battery energy storage systems

Questions landowners ask

Do these county rules apply inside Vacaville or Fairfield?

Confirm the parcel’s jurisdiction. The county FAQ directs owners of property within city limits to the respective city planning department.

Can I decide how much land to offer from the battery area alone?

Compare the full drawing, including access, construction space and utility routes, with the land you want to keep using.

Does the adopted ordinance approve my project?

No. Ask for the actual site decisions, conditions and outstanding work.

What should I ask about a removal bond?

Ask for the document, amount, coverage and who can call on it. Compare that security with the restoration obligations in your agreement.

Sources & further reading

The runoff discussion and refreshed county code and adoption links were checked November 19, 2026. Other site-specific claims were not reviewed in that check. Local rules and program details can change. Check the requirements for the actual project.

Want to ask about your land?

Send the location and what you know about the property. You don’t need a project plan, and you are not committing to a lease or sale.

Tell us about your land