Use the right township records
The published section provides a conditional-use route for utility-scale batteries in specified zoning districts. Confirm the actual parcel’s district and the current review requirements with the township before relying on a proposal.
There are other Buffalo Townships in Pennsylvania. Include Washington County when sharing the property location or searching for records. Ask the developer to identify the office reviewing this proposal and give you any written zoning response.
Start with the parcel reference or address and the current use. You do not need a finished battery design to ask about your property. If the developer describes a project as already approved, request the decision and the drawing it covers. An inquiry, an application and permission to build are different stages.
Reference: Buffalo Township, Washington County: official website · Buffalo Township, Washington County: published battery storage section 265-58.3

Record drainage conditions before agreeing to work
The battery section calls for a drainage maintenance plan and inspections before operation and periodically afterward, with repair and reporting requirements.
Walk through what you already know about the property with the team. Where does water collect after rain? Which ditch receives runoff? Are there buried tiles, culverts or areas that have needed repair? Tell the team when a location is uncertain rather than drawing a guessed line.
Ask who will investigate existing drainage and how those findings will be recorded. A photo of a wet field is useful context, but it does not replace a drainage investigation. Discuss which conditions need a survey, inspection or other professional work before construction.
If a tenant farms the property, invite their observations about wet areas and access after rain. Keep dated photos, descriptions and any existing plans together. Agree on who receives the pre-work report and how you can ask for corrections before equipment arrives.
Reference: Buffalo Township, Washington County: published battery storage section 265-58.3
| What you know | What to ask the team |
|---|---|
| A field stays wet after rain | How will the existing condition be investigated? |
| Tiles or culverts cross the area | Will their route and condition be documented? |
| A ditch serves retained fields | How will work preserve that drainage? |
| A tenant knows the problem areas | Who will collect their observations? |
Look beyond the battery fence
The application calls for a scaled layout showing drainage, access, easements and the connection route alongside the equipment.
Ask for the whole work area, including temporary construction space. Where would a trench cross the field? Would a new entrance change a ditch? Where would vehicles turn? Compare those areas with the property you want to keep farming, renting or otherwise using.
For example, a battery area in one corner may look separate from the rest of a field, while its access lane crosses the only route to that field. Mark that route on the drawing and discuss how both uses would work. Ask what happens during construction and what access remains afterward.
Have the team explain changes to the drawing as the design develops. Keep dated versions and ask which one the agreement refers to. Discuss whether additional land or a changed route needs your approval and a separate payment.
Reference: Buffalo Township, Washington County: published battery storage section 265-58.3
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landAgree on a practical way to report a problem
The published section requires a complaint-resolution plan and annual reporting that includes complaints and extraordinary events. Ask how the proposed process connects with your own notice rights and who keeps you informed about a property problem.
Ask for a named operating contact and a backup. How should you report standing water, a damaged culvert or a blocked farm entrance? What information should you send, and who will arrange an inspection?
Discuss how the agreement handles investigation, repair access and damage to the retained land. Ask your adviser to explain the notice process and your responsibilities. Township requirements and private promises should be reviewed together; do not assume one document answers every question.
Keep the date, location, photos and correspondence when a problem occurs. Explain what changed and how it affects your use. Ask for the proposed repair and timetable in writing, and keep the completion record with your original condition report.
If the developer or operator changes, ask who takes over the contact and repair arrangements. Request confirmation before a problem arises, rather than waiting until the person you used to call is no longer available.
Reference: Buffalo Township, Washington County: published battery storage section 265-58.3
Compare restoration promises with the land you want back
The decommissioning provision names the property owner or operator. Ask your adviser to explain that responsibility alongside the agreement and financial security before assuming every removal obligation rests only with the developer.
The published section addresses removal, site restoration and financial security, including an unfinished facility where construction has stopped.
Ask for the proposed removal plan and funding document. Does the plan address the same roads, trenches and drainage shown on the project map? Who would restore disturbed areas, and who would check the result?
Tell the team if you want an improvement retained, such as a suitable access lane. Discuss that preference explicitly; a general promise to remove everything may not describe what you want. Ask how the final condition will be documented and how it supports the land’s intended next use.
Neither these local records nor a nearby power line establishes a workable grid connection, active acquisition demand or a rent for your parcel. Ask the project team to explain its actual connection status and payment assumptions separately.
Reference: Buffalo Township, Washington County: published battery storage section 265-58.3
Check whose interests the insurance protects
The battery section requires project insurance and names the Township as an additional insured. It also requires a new project owner to register with the Township and comply with existing approvals. Neither provision, by itself, explains your private coverage or every responsibility after a transfer.
Have your insurance adviser review the proposed documents alongside the lease. Who is insured, which activities are covered and what notice would you receive if coverage changes? Ask whether construction, ordinary operation and removal are addressed, rather than treating a coverage amount in a presentation as the whole answer.
Discuss damage to retained fields, buildings and access routes. Which company would investigate a claim and who would authorize repairs? Keep the contact details and notice procedure available to any tenant who could discover a problem first.
Before agreeing to a project transfer, have your agreement reviewer explain what happens to insurance, guarantees, unpaid amounts and restoration duties. Ask for current documents from the incoming company. A transferable local approval does not establish that every private obligation has been fulfilled.
Reference: Buffalo Township, Washington County: published battery storage section 265-58.3
Send the location and what you already know
Start with your name, email and phone number, then identify the property in Buffalo Township, Washington County. Add the current use, approximate area or an existing offer if you know them. Property details are optional; you can inquire without a drainage survey.
Tell Sunland what matters to you: protecting a retained field, keeping an entrance open, understanding a proposed trench or reviewing restoration promises. An inquiry starts a conversation. It does not grant entry, reserve land or authorize an application.
Questions landowners ask
Do I need to locate every drain tile before contacting Sunland?
No. Share what you know and identify uncertainties. The project team should explain what investigation is needed before work.
Should the drawing include land outside the fence?
Ask for roads, trenches and temporary work areas as well as the equipment. Compare them with the land and access you want to keep using.
Does this guide cover Buffalo Township in Union or Butler County?
No. This guide concerns Buffalo Township in Washington County. Use the correct municipality’s records for the actual property.