FirstEnergy Pennsylvania / Pennsylvania

Battery storage land in FirstEnergy’s Pennsylvania electric areas

What Met-Ed, Penelec, Penn Power and West Penn Power area owners should ask about applications, conditional approvals and a proposed battery land agreement.

Could my land work?

Confirm the local electric service name and whether the proposal uses a customer distribution route or a wholesale route. FirstEnergy’s Pennsylvania resources distinguish application review from final authorization to operate. Neither a submitted application nor conditional approval tells you that a battery is ready to earn rent under your agreement.

Use the service name on the electric bill

FirstEnergy’s Pennsylvania connection page provides separate contacts for Met-Ed, Penelec, Penn Power and West Penn Power. Include the name associated with the property’s electric service rather than selecting one from a county or a company logo.

If the land has no account, send the municipality, county and address or road and explain that service needs confirmation. Also identify any tenant’s account or existing equipment. The utility contact and the company proposing to lease your land are different parties.

Reference: FirstEnergy: Pennsylvania distribution application and approval stages

Model landscape illustration of a parcel and its surrounding roads and terrain.

Determine which application route is proposed

The Pennsylvania page addresses small generation connecting to the distribution system. Its site-plan guidance includes storage equipment and the connection route. FirstEnergy separately directs wholesale generators selling through PJM to PJM’s application process.

Ask the developer which route fits its battery, what application reference exists and which design it covers. A storage field in a retail form does not by itself settle the route for a separate grid-serving project. The project team should explain both charging and export and the current rules it relies on.

Reference: FirstEnergy: Pennsylvania distribution application and approval stages · FirstEnergy: wholesale connection routes

Ask what an approval actually allows

FirstEnergy’s published Pennsylvania process separates engineering review and conditional approval from installation, inspection records and final authorization to operate. Ask which stage has been reached for the actual proposal.

Request the dated document behind a claim of approval. Find out whether upgrades, additional information or a different design are still required. A company might have permission to proceed with one step while important work remains. Avoid treating an application receipt as an operating project or using a different project’s approval as evidence for yours.

Reference: FirstEnergy: Pennsylvania distribution application and approval stages

Want to ask about your land?

Send the location and what you know. You don’t need a project plan.

Tell us about your land

Review the property plan alongside the application

Ask to see the entrance, equipment and connection route on the same plan. Explain where farm vehicles, tenants or deliveries need access. Identify land you intend to keep using and any areas with drainage or other features requiring investigation.

Find out whether the proposed reserved area can change after utility review. If work would cross another parcel, ask who secures those rights and what happens if it cannot. Your land agreement should distinguish investigation access, temporary construction areas and the final operating area.

Link the option timetable to the remaining work

Ask for a short list of remaining decisions, not just a projected construction date. Separate utility review, local approvals, commercial arrangements and the rights needed beyond your parcel. Find out which costs are estimates and who bears them.

Compare that list with the time the developer can hold your property and the payments during that period. Ask what happens if a study requires costly changes or the project is transferred. The agreement should explain the payment triggers and release of land rather than assume a utility milestone automatically starts rent.

Start with what you know about the land

Send Sunland your contact details and location. Add the electric service name, current use, approximate available area and any existing developer proposal if known. An application reference or dated approval helps us understand a claim, but it is not required to inquire.

You do not need to apply to the utility first. Further work must establish the project’s connection, approvals, layout and commercial fit. An inquiry does not enroll an account, reserve electrical capacity or commit you to a sale or lease.

Questions landowners ask

Is conditional approval the same as permission to operate?

No. The published customer process separates those stages. Ask which document applies to the proposal.

Should I use the retail portal for every battery?

No. Have the project team confirm the route; wholesale connection resources are separate.

Which FirstEnergy service name should I provide?

Use the name associated with the property’s electric service if known. Otherwise send the location and say it needs confirmation.

Sources & further reading

Sources checked 2026-10-04. Local rules and program details can change. Check the requirements for the actual project.