Start with the parcel, not the project’s place name
The 2020 Green Township record identifies VESI 25’s application at 248 Brighton Road with an Andover mailing address. It records approval of that application and variances with conditions. A mailing address or project name should not determine which municipality reviews a different property.
Give the team the actual location and block and lot if available. Ask it to confirm the municipal boundary and current review route. If an offer cites the nearby project, request the record that applies to your land rather than assuming the same approval follows it.
The township’s current zoning page describes review of uses and plans, permit decisions and referrals for variances. Have the applicant explain how it has classified the proposed battery, supporting equipment and existing business use. A battery behind a building is not automatically an accessory use.
You can begin an inquiry before obtaining a formal plan. Describe the building, tenants and space being considered. Identifying the property comes first; permission to build and connect remains a later, project-specific question.
Reference: Green Township: February 13, 2020 Land Use Board minutes, VESI 25 application and vote, pages 2–6 · Green Township: zoning official, permit review and property zoning resources

Draw the whole trip from the road to the equipment
The historical application described access through a business driveway, parking and loading area before reaching a separate gravel drive. That arrangement gives an owner a useful question: what parts of the working property would a battery operator need to cross?
Trace the route on a plan with the person responsible for deliveries. Mark customer entrances, loading doors, parked trailers and any space trucks need to turn. Would a maintenance visit block a dock? Could a delivery arrive while the battery team is moving equipment?
Discuss ordinary visits, major repairs and construction separately. A route that works for a car might need different arrangements for heavy equipment. Ask who organizes temporary parking changes, notices tenants and restores areas used during the work.
Put the agreed access rights in the documents. Identify the users, purposes and areas involved, including any rights requested outside the rented footprint. Ask how conflicts will be handled if the business expands or its delivery schedule changes.
Reference: Green Township: February 13, 2020 Land Use Board minutes, VESI 25 application and vote, pages 2–6
| Shared area | Owner question |
|---|---|
| Driveway and loading area | Who gets access, and how do deliveries keep moving? |
| Drainage and landscaped areas | Who inspects, maintains and repairs them? |
| Equipment route | What extra space is needed for construction or replacement? |
| Gates and controls | Who keeps access working when staff or operators change? |
Put maintenance boundaries on the same drawing
The hearing discussed different responsibilities for the fenced area, surrounding grass and access drive. For a new proposal, draw every maintenance boundary instead of relying on a phrase such as “the company takes care of the site.”
List mowing, vegetation clearance, pavement repair, snow removal and litter separately. Who handles a problem in an area both parties use? If the operator needs a clear route in winter, establish who keeps it open and who pays.
Ask whether your existing property contractor would take on additional work. Would you arrange it and be reimbursed, or would the operator hire its own contractor? Decide how an unexpected repair is approved and how quickly the responsible party must respond.
Compare those duties with the payment offered. Extra rent is easier to assess when you also know the work and expense left with you. Keep a record of the property’s condition before entry so damage can be distinguished from existing wear.
Reference: Green Township: February 13, 2020 Land Use Board minutes, VESI 25 application and vote, pages 2–6
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landCheck drainage beyond the fenced portion
Request a drawing that follows water through the battery area and into the rest of the property. Show existing drains, basins and low spots, along with proposed grading. A lease outline alone may not show where drainage work or continuing maintenance would occur.
Ask who cleans and repairs each part, including existing facilities the new layout would use. Would the operator need access outside its fence to inspect an outlet? Could a blocked drain affect the business parking area or a neighboring property?
Have the company explain what happens during construction and after equipment replacement. Agree on who repairs disturbed ground and confirms the drainage still works. Identify the contact for a flooding concern before work begins.
If a design changes, ask for the revised drawing and explanation of its effect on retained land. Moving cabinets can also move grading, cables or access. Your agreement should make clear how additional occupation or work is approved and paid for.
Separate a hearing promise from an ongoing obligation
The 2020 approval included conditions concerning noise information, fire-department training, access, lighting and removal. For a current proposal, request the actual decisions and the plans they cover. The township says official signed records are held by its clerk.
Identify which company is responsible for meeting each condition and keeping it satisfied. Ask for the current contact, the records you will receive and the procedure when equipment changes. A statement made at a hearing does not explain every responsibility in your private agreement.
Discuss how gates and access controls will remain usable after staff or contractors change. Who checks them and updates the responsible contacts? The owner should know whom to call when a gate, light or other site feature creates a problem for the business.
Have the team coordinate the proposal with tenants. Explain any continuing restrictions before a tenant renewal or sale. Keep the approved layout and private rights consistent so neither document leaves an unexpected obligation with the property.
Reference: Green Township: February 13, 2020 Land Use Board minutes, VESI 25 application and vote, pages 2–6 · Green Township: Land Use Board agendas, minutes and signed-record information
Name the party that will pay for removal
Ask what will be removed at the end: equipment, foundations, cables, fences and improvements outside the rented area. Decide which features you would want to retain. Include repair of shared routes used by removal crews.
Separate a promise to remove the installation from the resources available to pay for that work. Ask about the proposed funding or security, who can use it and how it is maintained over the agreement. Review it alongside insurance and any other contract protection.
Define what happens if the battery stops working before the lease ends. Who confirms that the site has stopped being used, what notice is required and when must cleanup begin? Avoid leaving the trigger entirely dependent on a company that may no longer respond.
If another company takes over, confirm who owes unpaid rent, maintains shared areas and completes restoration. Request written transfer procedures and updated contacts. The fact that equipment remains on the land does not identify the party responsible for your payments.
Tell us about the business and the land behind it
Provide your contact details, then the property location and county. Mention Green Township and describe the present use, tenants and any offer you have received. Acreage and a parcel number are optional.
Point out shared driveways, loading areas or drainage concerns you already know about. You do not need to commission a drawing or sign a land agreement before contacting Sunland. An initial description can identify the questions the team needs to investigate.
We can review the information and may follow up about the property. An inquiry does not reserve the land, authorize an application or establish suitability. The actual connection, approvals, layout and financial terms still need review.
Questions landowners ask
Does an Andover mailing address mean Andover Township handles the application?
Confirm the parcel’s actual municipality. The cited Green Township record itself uses an Andover mailing address; a place name alone does not determine jurisdiction.
Does the historical Green Township approval permit another battery site?
No. A different property and design need their own current review. Request the applicable rules, decisions and connection records.
Should access through my parking lot be included in the land agreement?
Yes, make the requested route and purposes clear. Discuss deliveries, maintenance, construction and repairs with everyone who uses the area.
Does a removal condition explain how cleanup will be funded?
Not by itself. Ask who will perform and pay for removal, what protection supports the promise and how a stopped or transferred project is handled.
Sources & further reading
Sources checked 2026-10-06. Local rules and program details can change. Check the requirements for the actual project.