Check electric service, not just the company name
If the parcel has service, use the electric utility listed on the bill. Do not assume a company providing another service also handles the electric connection. If the land has no meter, include the location and say that the utility is unknown.
PSE&G’s New Jersey resource is separate from PSEG Long Island. Start with the appropriate local utility and its current process. A map result from the other service area is not evidence about your parcel.

Understand what the PSE&G map describes
PSE&G describes its map as preliminary insight into distributed-generation capacity on its 4 kV and 13 kV distribution systems. The page says it is updated quarterly, is not real time and does not guarantee approval; a formal application starts the official evaluation.
That makes it a useful research resource, not a battery-site certificate. Ask which operating assumptions have been checked for the storage proposal, including the power drawn to charge. A generation result alone does not settle that question.
Reference: PSE&G New Jersey: hosting-capacity map and limitations
Ask for the actual connection proposal
Have the developer identify the proposed connection point and the route from the equipment to it. Ask which work is complete and which is only an assumption. There is a difference between viewing a map, filing an application and receiving engineering results.
If someone quotes a low connection cost, ask what that estimate includes and whether the utility has reviewed it. Find out who would pay for studies, equipment and upgrades, and what happens if the final cost is different.
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landSeparate a program opportunity from your land agreement
A developer may describe a storage program or expected project revenue. Ask which current requirements apply to the actual project, what milestones must be met and what remains uncertain. Your land payment should be explained independently.
Do not assume a grant, application or project queue entry guarantees a lease payment. Ask when the option and lease payments begin and what events can delay them. You should be able to understand the offer without having to predict future energy prices.
Local land-use questions still need an answer
Include the municipality and parcel number if known. Ask which office would review the proposed use and whether the layout can fit while preserving your access, parking or farming needs.
For an unused part of a commercial site, mark delivery routes and future building space. For rural land, show field access and known drainage areas. Ask for all affected rights on one drawing, including cable routes outside the battery enclosure.
You can start with a simple property note
Send your contact details and the land location. Add the electric utility if known and explain whether the whole parcel or only part could be considered. Optional acreage and parcel details can help identify it.
You do not need to use the map before contacting Sunland. If you already have a proposal, mention it and identify the questions you want answered. We can begin with what you know; further investigation is needed before confirming project feasibility.
Questions landowners ask
Does PSE&G’s map guarantee battery approval?
No. The published resource is preliminary distributed-generation information and requires a formal project evaluation.
Is PSE&G New Jersey the same resource as PSEG Long Island?
No. Use the resources and connection process for the actual electric service area.
Can I submit land if I do not know the utility?
Yes. Provide the property location and say you are unsure. The utility and proposed connection need to be identified.