Identify the project behind the offer
Ask for the developer’s legal name, the proposed project name and a drawing of your property’s role. Who would sign the agreement with you? Who would build and operate the equipment? If the person contacting you represents another company, ask them to explain that relationship.
A familiar utility name in a presentation does not tell you who owes the land payments. Match the names on the offer, the agreement and any public application. Have your adviser explain any differences before you sign.
If the offer refers to the ACE proposal, ask for the document showing why additional private rights are needed. The BPU order describes a site already owned by the utility. It does not establish a land-buying program for nearby owners or a workable connection for a separate parcel.
Reference: New Jersey BPU: September 9, 2026 procedural order, EO26070402

Read what an order actually decides
The September order records an administrative deficiency and retains the petition for a hearing if a complete version is submitted. Later decisions need to be checked separately.
Ask the team which decision it relies on and what remains outstanding. A docket number helps you find records, but the existence of a docket does not answer whether the requested investment, local site plan or electrical arrangement has been approved.
If someone says approvals are complete, ask for a short list of the decisions, their dates and the plan each covers. Request an explanation of any conditions still to be met. Keep those records with the offer so you can compare a later update with the original claim.
Do not use a project’s announced schedule as your payment schedule. Ask which event starts your rent or purchase closing, how that event is evidenced and what happens if the developer needs more time.
Reference: New Jersey BPU: September 9, 2026 procedural order, EO26070402
| Claim in an offer | Record to request |
|---|---|
| The project is approved | The decision and its remaining conditions |
| Your land is needed for the project | A drawing and explanation of the requested use |
| The utility is involved | The actual party and its documented role |
| Payments begin at a milestone | The agreement’s trigger and evidence required |
Separate a battery site from a road or cable route
Ask which rights are being requested: equipment space, an access lane, electrical lines, temporary work areas or permission to investigate. These uses can affect different parts of a property and may call for different terms.
For example, you may be willing to discuss a cable along a boundary while keeping the rest of the parcel available for another use. Ask for the route, work width, access arrangements and restoration proposal. Do not assume a conversation about battery rent describes a cable-only request.
Mark existing buildings, tenants, farm entrances and areas you want to retain on the drawing. Ask how work would affect them during construction and operation. Discuss who needs to approve a changed route and whether more land requires another agreement.
If the proposal depends on rights across someone else’s property, ask how those rights will be obtained and what happens to your reservation if they cannot be secured. Keep the land rights and electrical connection questions together.
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landCheck the local route for your actual property
Use Pittsgrove Township’s municipal directory to identify the relevant local office. Provide the block and lot or property location, current use and proposed battery-related use when asking about review.
Pittsgrove Township and Upper Pittsgrove Township are different municipalities. Confirm which contains the parcel. Ask for the current zoning response for the actual layout rather than assuming that every Salem County property follows the same route.
Have the developer identify the local and other reviews that apply to its proposal. Ask who will prepare the applications, who pays the costs and what owner authorization is requested. A state utility proceeding does not by itself explain those private agreement terms.
Reference: Pittsgrove Township: municipal department directory
Make a waiting period understandable
If the developer wants an option while review continues, ask how long the land is reserved, what you receive during that period and who can extend it. Discuss which existing uses can continue and what would release the land if the project cannot proceed.
Ask for progress updates you can understand: the next decision, the expected timing and the reason for a change. Keep an update separate from a request to expand the area or extend the agreement. Review any amendment with the same care as the first offer.
Nearby battery activity can be a reason to investigate your property, but it does not set its value or prove demand for it. Ask the team to explain the actual site need and the basis for its offer.
Send your location and the question you want answered
Start with your name, email and phone number, then identify the Pittsgrove property. Add the current use, approximate area or existing offer if known. Property details are optional; you can inquire before obtaining a survey or project plan.
Tell Sunland whether you are considering equipment space, an access or electrical route, or an offer whose project connection is unclear. An inquiry starts a conversation. It does not reserve the property, grant entry or authorize an application.
Questions landowners ask
Does the September BPU order approve the ACE project?
The cited order designates a commissioner and sets service requirements. It does not approve the proposed investment; check any later decision separately.
Does the utility proposal mean nearby land is being acquired?
The cited order describes utility-owned land. Ask for the actual reason your parcel is needed and the rights requested; neighboring acquisition demand is not established.
Can I inquire about a cable route rather than a battery lease?
Yes. Tell us what is proposed and where. A route, equipment site and temporary work area should each be clearly explained.
Sources & further reading
Sources checked 2026-10-04. Local rules and program details can change. Check the requirements for the actual project.