What the September record actually does
The BPU’s September 9 order describes ACE’s proposal for up to 500 MW on ACE-owned land in Pittsgrove Township. It designates a presiding commissioner and retains the matter for hearing when an administratively complete petition is submitted. This procedural order is not a project construction approval; later decisions need checking.
A proposal on utility-owned property has a different land starting point from a developer seeking your parcel. If someone cites the ACE record, ask why it matters to their own design and whether they are associated with that project or proposing something separate.
Reference: New Jersey BPU: September 2026 Atlantic City Electric procedural order

Identify whose project you are discussing
Ask for the developer name, signing entity and project name. Find out whether the proposed operator would be the utility, an independent developer or another buyer. Do not infer an affiliation because the project would connect in ACE’s area.
Request the current application references and a simple explanation of the remaining decisions. A petition, a hearing order and a final decision establish different things. Keep the date and subject of any cited document with your property records.
A solar application page has a narrower purpose
ACE’s MyGeneration landing page describes submitting solar equipment for interconnection and obtaining permission to operate. That page is a useful solar reference, not evidence that a separate storage project uses the same process or qualifies for the same billing treatment.
Ask the developer which current storage connection resources and operating arrangement apply. Explain whether the property has an existing electric account, solar equipment or no service. The project team should confirm the route for the planned charging and export.
Reference: Atlantic City Electric: MyGeneration solar application process
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landThe actual location still matters
Give the municipality and county as well as the street or road. A South Jersey address alone does not establish the electric service boundary or the local land-use authority. Include the parcel reference if you have it.
Ask the developer to identify the proposed equipment area, entrance and cable route. Mark homes, businesses, drainage and uses you want to preserve. A regional utility project does not establish the rules or usable footprint on another owner’s site.
A utility-zone label may not identify every connection party
PJM’s September 18, 2025 study for AF1-238 lists a Cumberland County storage proposal in Atlantic City Electric’s zone. Its connection section identifies Vineland Municipal Electric Utility’s system and directs the developer to that utility for physical work scope. The zone label alone does not describe the entire connection arrangement.
Ask who owns the line at the proposed connection point, who must review the work and which agreements are needed. Keep those answers with the actual project reference. This dated study does not establish the present status of the project or capacity for another parcel.
A zero in one study table does not settle the whole budget
The same report shows zero allocated costs in its PJM summary while assigning the municipal work discussion separately. Do not treat that table as proof that every connection task is free.
Request a budget that identifies each party’s work, unresolved estimates and responsibility for land, cable routes and access. Ask how missing scope affects your option deadline and payments. The developer should explain the complete arrangement before asking you to rely on a cost headline.
Understand what an option would hold
If the developer wants time to study the parcel, identify the reserved area, entry rights, payments and full possible term. Ask who can extend it and how you recover the land if the connection or approval route fails.
Keep a future revenue contract separate from your compensation. A utility proposal or state initiative does not start rent under your agreement. Ask how damage, investigation work and temporary access would be handled during the period before construction is certain.
Send a short property note
Provide Sunland your contact details and location. Add ACE as the electric utility if known, the current use and whether you could consider a lease, sale or either. Mention any developer approach and which record it cites.
You can inquire while still unsure about utility service or local rules. Further review will need to establish the site, connection and commercial fit. The inquiry does not reserve your property, promise a buyer or establish an approval.
Questions landowners ask
Did the September hearing order approve the ACE project?
No. The cited order designates a commissioner and addresses the proceeding. Check subsequent decisions for later status.
Does a utility-owned battery mean ACE is seeking my land?
No. That record concerns a specified proposal on utility-owned property.
Can I assume the solar application route applies to standalone storage?
No. Ask which current route fits the storage design and intended operation.
Sources & further reading
Sources checked 2026-10-06. Local rules and program details can change. Check the requirements for the actual project.