Check whether the relevant records are available online
The county clerk directs researchers to an online record service for documents from October 31, 2006 forward. The clerk says records before that date remain in books at the office. If your deed refers to an earlier document, ask how the company’s title review will obtain and examine it.
A recent purchase does not tell you the age of every document affecting the land. Read the references in your deed with your adviser. An older recorded agreement may need attention even when the current deed is easy to find online.
Ask for a clear account of the research: which documents were obtained, which references were followed and which questions remain. A report that nothing appeared under your name should not stand in for that explanation.
Keep the book, volume, page or instrument references you already have. They can help the clerk or title professional locate the right material. Confirm the current research arrangements with the office before making a trip for older books.
Reference: Hardeman County Clerk: online record dates and older office books

Use document references as well as names
The county-linked portal’s public search screen has fields for dates, a person’s full name and an instrument number. Its guide describes additional searches using party names, document types, legal descriptions and book or volume references. These are ways to locate material; they are not a determination that the project can use your property.
If you have an instrument number from a deed or earlier title paperwork, retain it along with the document itself. Ask your title adviser which other names or references belong in the review. Land held through a company, family transfer or older owner may call for more than a search of your current name.
Check that a result concerns the correct tract. The same name can appear on documents for different properties. Have the reviewer compare the legal description and referenced records rather than relying on the name or street address alone.
The portal describes obtaining copies online. Confirm the current charge, page coverage and access arrangements before ordering. Save the complete copy and its reference when you obtain it. You can ask Sunland about the property without buying records or creating a portal account first.
Reference: County-linked Hardeman public-record portal: document search · County-linked public-record portal: search user guide
| What you have | What to ask the reviewer |
|---|---|
| Your current deed | Which earlier documents does it reference? |
| An online search result | Does the description identify this tract? |
| A book or instrument reference | Was the complete document obtained and read? |
| A proposed project drawing | Which records affect each area and route? |
Draw the entrance and cable route before reviewing the rights
Ask the company for a drawing that shows more than the fenced battery area. Include the entrance, delivery route, electrical connection, drainage work and any temporary construction space. Mark which pieces would lie on your land and which would cross another property.
Have your adviser compare that drawing with the records. If the company expects to use an existing easement, ask what document it relies on and whether the proposed use fits its terms. A route that people have used for years still needs an explanation of the rights the company would receive.
Discuss what happens where project traffic or cables cross the land you keep. Ask about continued access to fields, gates, maintenance visits and repairs. Put the proposed areas and responsibilities into the agreement so that the owner and company are discussing the same plan.
Separate permanent rights from temporary access for surveys and testing. A request to investigate the site should identify the allowed work, notice, duration and restoration. Review any broader right the document would give the company before signing.
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landKeep ownership, appraisal information and project authority separate
Hardeman County publishes a contact resource for its appraisal office. That can help you find the appropriate office for questions about appraisal information. It does not by itself resolve the title, boundaries, easements or approvals for a battery project.
Ask your adviser to identify the owners and any other parties whose involvement is needed for the proposed transaction. Mention joint ownership, an estate, a trust, a company or a mortgage early so the review can address your circumstances.
If the company proposes to use only part of the tract, ask how that area will be described. Compare the proposed description with the land you intend to retain and any access you need. Do not assume an appraisal parcel label supplies the description for a lease or sale.
Keep tax questions in the discussion as well. Ask who will pay for the professional review of any change in land use or appraisal treatment and how the private agreement assigns the resulting costs. The contact page reviewed for this guide does not establish the tax treatment of a battery project.
Reference: Hardeman County: appraisal office contact resource
Ask for the approval process for the actual location
This guide concerns Hardeman County, Texas, around Quanah. Establish whether the tract and any outside routes fall under county, city or another authority. A nearby town name in an address does not settle that question.
The county lists precinct contacts and Commissioners Court resources. Ask the company to identify the road authority and process for the proposed entrance or crossing. The contact directory is a starting point for the inquiry, not an issued driveway approval or a finding that no approval is needed.
Have the company explain the development, fire and floodplain review that applies to its proposal. Ask for the responsible offices, submitted plans, decisions and conditions as the work advances. The record-search pages do not establish the county’s complete battery permitting requirements.
Electrical connection requires its own account of progress. Ask which utility will study the connection, what has been submitted and what remains. A deed review, accessible road or nearby electrical line does not confirm that a battery can charge and discharge at the proposed size.
Reference: Hardeman County: precinct and Commissioners Court contact resources
Set deadlines and costs for resolving missing records
A company may ask to reserve the land while it investigates. Ask how long that reservation lasts, what you receive during it and what allows an extension. Identify the unanswered title or access questions that the company expects to resolve.
Agree who will order records, pay for research, arrange surveys and obtain professional advice. If an older document needs to be found in office books, include that work in the company’s plan instead of treating the online search as finished diligence.
Ask what happens if the route cannot be secured or the records reveal a conflict. Can the layout change? Would that change the area, payment or effect on retained land? Understand what requires your approval and how an unresolved issue affects the agreement’s end date.
If the project company changes, ask who carries on the obligations. Keep the final documents, drawings, amendments and responsible-party contacts together. A later owner or company should be able to see which land and rights were agreed to.
Tell Sunland about the land and the questions you already have
Begin with contact details, then the property location. This page’s form selects Hardeman County and Texas; change them if necessary. Acreage and parcel number are optional.
Describe the current use, entrance and whether you would consider a lease, sale or part of the property. If an existing offer mentions an easement, an older deed reference or another owner, explain the question in your own words.
You do not need a complete record search or a project drawing to start the conversation. Share what you know, including anything you want to keep using on the property. Sunland may follow up for more information.
Sending an inquiry does not authorize a title filing, site visit or construction, reserve the land, or commit you to an agreement. Any proposed transaction would need its own review and documents.
Questions landowners ask
How far back do Hardeman County’s online records go?
The county clerk says the online service covers records from October 31, 2006 forward, while earlier records remain in office books. Ask how any older documents referenced by your deed will be reviewed.
Does an empty online search show there are no easements?
It does not establish that for your property. Ask a title professional to review the relevant documents, references and search coverage, then compare the rights with the proposed routes.
What information helps locate a document?
Keep any instrument number, book, volume or page reference you already have. The county-linked portal also provides name and date search fields; its guide describes other search options. A result still needs to be checked against the correct tract.
Should the review include land outside the battery fence?
Yes. Ask about the entrance, electrical route, drainage work and temporary construction areas, including any other property crossed. Review the proposed rights and the effects on the land you retain.
Do the record-search pages confirm the site has battery approval?
No. Property-record research, permission for development or road work and electrical connection are separate matters. Ask the company for the actual process and decisions for the proposed site.
Do I need to purchase records before contacting Sunland?
No. Start with contact details and location. Acreage and parcel number are optional; describe any existing offer or property question you would like to discuss.
Sources & further reading
County clerk, appraisal and precinct pages reviewed October 8, 2026, along with the county-linked eDoc directory, portal About page, public search screen and user guide. The clerk supplies the online date boundary; no actual deed, index, parcel, search result or title opinion was reviewed. Portal copy-access statements differ between its About page and guide; prices and access duration were not established. Complete current battery development, floodplain and fire rules, actual road/parcel authority, grid capacity and land availability were not established. Local rules and program details can change. Check the requirements for the actual project.