Start with the parcel and the authority that reviews it
A Nacogdoches address is a starting point, not a jurisdiction decision. Identify the parcel on a map and ask whether it lies inside the city, in its extraterritorial jurisdiction (ETJ), or elsewhere in the county. Have the responsible office confirm which reviews apply to the actual location.
The city’s Planning & Zoning page describes development services within city limits and the ETJ. That statement does not mean every city zoning rule applies throughout the ETJ. Ask staff to distinguish the applicable zoning, platting and other development responsibilities rather than treating those boundaries as interchangeable.
Describe the proposal as battery energy storage and explain what the company intends to install. Include whether solar panels are also proposed, where vehicles enter, and where the electrical route leaves the tract. A district name such as industrial or agricultural does not by itself establish permission for this use.
Request the applicable use classification and review path for that description. The general city pages reviewed here do not identify a battery-specific classification. If the company says the property already qualifies, ask for the supporting city determination and the layout it covers.
Reference: City of Nacogdoches: Planning & Zoning · City of Nacogdoches: posted Project Development Checklist

Know what a zoning verification letter answers
The city offers a municipal zoning verification letter for a particular parcel. Its guidance requires a detailed request describing the proposed structure or use and calls for separate applications when more than one parcel is involved. Give the reviewer a description that matches the actual project, rather than a broad label that could describe several different uses.
The city lists zoning districts and overlays, nearby zoning, planning exceptions, nonconforming uses and development dimensions among the information a letter can contain. Read the letter and any referenced conditions together. Ask the company to explain which parts affect the land it wants to occupy.
The same guidance explicitly excludes easement identification, building permit information, certificates of occupancy and building or fire code violations. Those exclusions matter. A favorable zoning description cannot settle whether another party has rights across the site or whether the design has passed another department’s review.
If planning permits are mentioned, ask for their actual conditions and drawings. The city says planning staff may include copies on request. Compare the approved or described use with the proposed equipment, access and occupied area; do not rely only on the letter’s heading.
Reference: City of Nacogdoches: zoning verification letters
| Information you have | Question still to answer |
|---|---|
| Zoning letter | What does it say about this parcel and this proposed use? |
| Existing planning permit | Which drawings and conditions apply to the new proposal? |
| Recorded easement or deed | What rights affect the planned site and access route? |
| Preliminary city feedback | Which applications and issued approvals remain? |
Bring a useful drawing to an early city discussion
Nacogdoches offers pre-development meetings for preliminary questions and site-plan feedback. The city describes participation by multiple departments and asks applicants to have drawings or sketches available. A meeting helps identify work ahead; it is not an issued permit.
Ask the company for a drawing with the parcel boundaries, proposed battery area, gates, roads and electrical route. Mark existing buildings and the parts of the property you will keep using. Show temporary construction areas as well as the completed site so that the conversation addresses the whole request.
The meeting form includes topics such as driveway design, drainage, detention, platting, easements and fire access. Use the relevant topics to organize the discussion. Ask who needs to review each item, what information is missing and whether the initial layout needs to change.
Keep a written list of the remaining steps after the discussion. For each one, name the party who prepares it and the decision needed before work proceeds. If a concept drawing changes later, ask whether the earlier feedback still applies. The city assigns confirmed meeting dates; a requested time is not a scheduled appointment.
Reference: City of Nacogdoches: pre-development meeting guidance and request form
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landCompare the proposed area with the property you want to retain
The posted general development checklist begins with property lines and asks whether portions of the land will be sold. It also raises zoning, platting, setbacks, drainage and floodplain questions. It is a useful discussion checklist, not a complete battery permit determination or a substitute for current city requirements.
If the company wants part of a larger tract, show that portion on the drawing before agreeing to it. Ask how you will reach the remaining land and whether a road, drainage feature or electrical corridor limits where you can build or use it later. A fenced equipment area may be only part of the rights requested.
For uncertain boundaries, have the appropriate survey professional establish what is needed. Ask city staff whether the proposed transaction or division calls for a plat review. Selling a portion and leasing a portion are different arrangements; the checklist does not settle the process for every agreement.
Discuss drainage and floodplain review with the responsible office using the current site information. The city’s Engineering/GIS page identifies related municipal functions. Ask the company to show how access and site work affect runoff and what studies or decisions are required. This guide does not apply the checklist’s numerical thresholds or historic fees as current battery rules.
Reference: City of Nacogdoches: posted Project Development Checklist · City of Nacogdoches: Engineering / GIS
Review private rights and the agreement separately
A zoning letter does not identify easements. Have your title, survey or legal adviser review the rights that affect the actual proposed area and routes. Supply existing deeds, easement documents and surveys you have, and ask what further records are needed. A map showing a road is not enough to establish the company’s right to use it.
Before granting an option or lease, identify the permanent equipment area, access rights, electrical route and temporary work areas. Ask which rights the company can change and what requires your agreement. Keep the land description and the current drawing with the contract so the requested use can be compared with the words you sign.
Discuss who pays for studies and applications, what happens if the layout changes, and how long the company can reserve the land while approvals or grid review are pending. Know when payment starts and how you can recover the land if the project does not proceed.
A city discussion also does not establish an electrical connection. Ask the company what utility or grid review has actually occurred and what remains unresolved. Treat nearby infrastructure as something to investigate, not a promise of capacity, cost or a construction date.
Reference: City of Nacogdoches: zoning verification letters · City of Nacogdoches: pre-development meeting guidance and request form
Send the property location to begin a Sunland review
You can begin with the property location and your contact information. An address, parcel number or clear map location helps us identify the land. If you are unsure whether the property is inside Nacogdoches city limits, say so rather than guessing.
Tell us if you own the whole tract, whether you are considering a lease or sale, and which parts you would like to keep using. If a company has already approached you, explain what it has requested and whether you have signed anything. Do not assume an existing proposal or nearby project means another company can use the same land.
Use the property review form on this page to reach Sunland America. This is an initial conversation about the property, not an application to the city or a commitment to lease or sell. A zoning letter, paid study or complete permit package is not required to send the initial inquiry.
Reference: City of Nacogdoches: zoning verification letters · City of Nacogdoches: pre-development meeting guidance and request form
Questions landowners ask
Does an industrial zoning label mean battery storage is allowed?
Do not assume that from the label alone. Give Nacogdoches planning staff the parcel and a specific description of the battery proposal, then ask for the applicable use classification and review path. The general guidance reviewed here does not establish a battery-specific classification.
Does a zoning verification letter identify easements?
No. The city’s guidance expressly excludes identification of property easements. Have the relevant property documents reviewed separately for the proposed equipment area, access and electrical route.
Is a pre-development meeting an approval?
No. The city describes early questions and preliminary site-plan feedback. Ask for the remaining applications, reviews and issued decisions after the meeting, and confirm what must happen before work starts.
Can one zoning letter cover several parcels?
The city’s guidance says letters are limited to one parcel and multiple parcels require multiple applications. Identify each parcel involved in the proposal, including access or other areas beyond the equipment site.
Do these city requirements apply throughout Nacogdoches County?
This guide concerns the city’s process. Confirm the parcel’s jurisdiction and applicable reviews with the responsible office. A city mailing address or location in the ETJ does not establish that all city zoning rules apply, and these sources do not establish the unincorporated county’s battery review route.
Do I need a city letter before contacting Sunland America?
No. Start with your contact information and the property location. Tell us what you know about the land and any existing proposal. The initial Sunland inquiry does not authorize city applications or commit you to a transaction.
Sources & further reading
City planning, zoning-letter, pre-development, application and Engineering/GIS pages reviewed October 8, 2026; the posted four-page general development checklist was read and visually inspected. These sources do not establish a battery-specific use classification, current permit fees or a guaranteed approval timetable. Underlying zoning and floodplain codes have not been reviewed here. This city guide does not establish requirements for unincorporated Nacogdoches County or all land in the ETJ. Local rules and program details can change. Check the requirements for the actual project.