Know what the local example actually covers
The county’s October 2024 hearing notice described the Crockett solar proposal with a battery component. In January 2025, the PSC confirmed that Order 91485 had become final. The case concerns a particular combined project, rather than a countywide authorization for standalone batteries.
If a developer cites that case, ask which parts of its proposal are comparable. Is it seeking new land for a separate battery, adding equipment to an existing solar arrangement or revising an approved project? Each answer raises different questions about documents and rights.
Use the actual parcel reference and governing authority. A Cordova or Easton mailing address does not identify the whole approval route. If the developer says an approval already covers your land, ask for the decision, associated drawing and explanation of the area covered.
Reference: Talbot County: October 2024 Crockett solar and storage hearing notice · Maryland PSC: Case 9723, item 48, final Order 91485 and license conditions

A final order is not a finished project
The Crockett order grants a certificate subject to incorporated license conditions. Those conditions address subsequent work, including final site and battery details. The existence of an order should not be used as proof that every condition is satisfied or that the installation is operating.
Ask the team for a short status summary backed by document references. What is final, what remains under review and which equipment details could still change? Include the electrical connection in that discussion; a land-use decision does not answer every connection question.
Keep application drawings, revised drawings and final approved drawings separate. When a plan changes, ask whether it affects the land area, entrances, screening or equipment beside retained uses. Read any updated document before agreeing to additional rights.
Reference: Maryland PSC: Case 9723, item 48, final Order 91485 and license conditions
| Record being discussed | What to ask |
|---|---|
| Hearing notice | What later decision followed? |
| Final order | Which conditions still need to be satisfied? |
| Revised drawing | What changed on my land? |
| Land agreement | Which rights and payments does this version provide? |
Read existing solar rights before adding batteries
If your property already has a solar option or lease, share that fact at the start. Ask your adviser whether the document covers the proposed battery, extra electrical equipment and any new access. An existing relationship should not replace a review of the actual rights requested.
Ask for both the earlier arrangement and proposed change on a drawing. Where would the battery sit, what construction area is needed and would another part of the farm become unavailable? If an amendment is proposed, identify the new rights and what payment or responsibility changes with them.
The Crockett license conditions address site control before construction and the time needed for removal. For your own agreement, ask when possession begins, when payments start and how the land is released after equipment is removed. Keep the private agreement’s dates visible alongside the project schedule.
Reference: Maryland PSC: Case 9723, item 48, final Order 91485 and license conditions
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landKeep retained development rights in the discussion
The order’s discussion includes a rural development rights arrangement for its site. If an offer includes a restriction on land outside the equipment area, ask what you would give up and which document would record that restriction. Do not assume a promise about a small footprint settles the question.
Tell the team about future plans: another home, a farm building, a tenant expansion or a later sale. Ask your adviser how the proposed restriction would affect those uses and whether it continues after a project ends or changes ownership.
Request the actual proposed instrument and a boundary drawing. Who would enforce it, can it be changed and what would a future buyer need to know? Terms used in another project are an example to investigate, not automatic requirements or protections for your land.
Reference: Maryland PSC: Case 9723, item 48, final Order 91485 and license conditions
Use one drawing for everyday access and construction
Show the developer the entrances, lanes and turning areas you need to keep using. A farm operator or commercial tenant may know constraints that do not appear on a parcel map. Include deliveries, seasonal work and drainage maintenance in the conversation.
Ask where trucks would enter, where equipment would be stored and which routes are temporary. Who gives advance notice, repairs damage and restores a staging area when construction ends? If a route crosses land you retain, make that right understandable in the agreement.
Discuss operating access as well as construction. Where would maintenance crews and responders enter, and who keeps gates and routes usable? Ask for a current operating contact. Keep technical operating and response duties with the qualified project team.
Ask how removal would return useful land
The final Crockett conditions incorporate a removal plan, financial support and periodic updates. That is a useful reminder to request the actual plan for the offer you receive. A general statement that equipment will be recycled does not explain how your land will be restored.
Ask which roads, foundations, cables, fences and supporting equipment would be removed. What soil work follows, and what would you receive as evidence that restoration is complete? If you want a road or screening retained, ask how that request is documented and whether approval is needed.
Compare public removal funding with your private agreement. Who holds the security, who can use it and what happens if the operator stops responding? Ask how duties continue after a project transfer. Funding for removal should not be assumed to cover unpaid rent or every damage claim.
Reference: Maryland PSC: Case 9723, item 48, final Order 91485 and license conditions
Send the property location and what you want to keep
Start with your contact details and the land’s location in the form. Add Talbot County, current use and whether any solar agreement or approval already exists. Acreage and a parcel number are helpful if available, but optional.
Describe what could be available and what must stay usable. If someone has approached you, mention whether the proposal is a battery addition, a combined project or storage alone. You can begin without interpreting a PSC order or choosing a battery size.
Further review still needs to establish the design, land rights, connection, approvals and commercial fit. Sending an inquiry does not authorize an application, reserve your property or commit you to a lease or sale.
Questions landowners ask
Does the Crockett approval mean nearby land is approved for batteries?
No. It concerns a specific combined solar-and-storage project. Your parcel, design, rights and approval route need their own review.
Can batteries be added under my existing solar lease?
Have the actual agreement and proposed layout reviewed. Do not assume that it grants every additional equipment, access or construction right.
Does a final PSC order prove construction is complete?
No. Ask for current compliance, construction and operating records rather than infer those milestones from the order alone.
What if I want to keep farming the rest of the property?
Describe the fields, access and drainage you need preserved. Review any recorded restrictions as well as the equipment footprint.
Sources & further reading
Sources checked 2026-10-05. Local rules and program details can change. Check the requirements for the actual project.