Start with the electric account, not the mailing address
A property can have several service providers. Use the electricity bill to identify the electric utility, rather than assuming that the company supplying gas or internet also supplies power. For vacant land, send the address or road and say that the electric provider has not been confirmed.
Explain how the property is used today. A warehouse with a tenant account, an owner-operated business and a field with no service present different questions. Tell the project team which buildings, entrances and parts of the land you want to keep using.
Ask whose account would supply charging electricity and who would receive any project bills. If the developer proposes a separate connection, have it mark that connection on the drawing. If it proposes to use existing service, ask what would change for the present customer.
Do not send account passwords or authorize an account transfer with an initial land inquiry. Sunland can start with the location and a description of the property. Detailed account information can be requested later if it is needed for a specific review.

Ask what the application is actually for
Easton Utilities links an interconnection application that separates load-offsetting, net-metered, wholesale and backup intentions. The posted document bears a 2011 revision date. That makes it a useful prompt for a conversation, not evidence that its printed thresholds or fees are the current route for your battery.
Ask the project company to state how the battery would charge, whether it would export and whether it would serve an existing customer. Then request the utility’s confirmation of the applicable process, form and tariff. You should not have to choose an engineering category yourself.
If a developer shows you an application receipt, ask what the receipt confirms. It may show that paperwork was received without establishing that the connection is approved, that all work is paid for or that construction can begin.
Keep the project name, applicant, location and drawing revision together. If the reserved land or operating plan changes, ask whether the earlier utility response still addresses the current proposal. A response for a different layout should not quietly become the basis of your land commitment.
Reference: Easton Utilities: posted Maryland Level 2–4 interconnection application · Easton Utilities: solar, net metering and linked application forms
Keep solar billing separate from the battery offer
The utility’s net-metering page is framed around solar customers. Its posted electric tariff describes a customer-generation classification intended to offset the customer’s electricity requirements. Those records do not establish billing treatment or eligibility for a separate standalone battery.
Ask which parts of the proposal involve your existing electricity bill, if any. A payment for use of land, savings on a business account and income earned by the project company are different arrangements. Have each described separately rather than rolled into one attractive number.
If the battery would be added to existing solar, ask how the addition affects the current connection and operating restrictions. Request written confirmation for the proposed change before relying on an older solar approval.
For a lease offer, focus on the payment clause: when payments start, how extensions work and what happens if the expected electrical arrangement is not available. A developer’s estimate of energy revenue does not tell you what it owes the owner.
Reference: Easton Utilities: solar, net metering and linked application forms · Easton Utilities Commission: posted electric tariff
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landShow existing utility rights on the same drawing
The Town of Easton checklist asks for existing easements and deed references, correlated site, utility and landscape plans, and adequate utility access. It says permanent structures cannot occupy a utility easement. This is general site-plan guidance, not a battery-use approval.
Have the project team put the battery area, proposed cables and existing utility corridors on one drawing. Include water, sewer, gas and communications routes where known. An apparently empty strip of land may already carry rights that limit what can be placed there.
Ask which existing rights the project expects to use and which new rights it needs from you. The proposed battery lease should not blur those together. If a new route crosses an existing corridor, identify who obtains any necessary agreement and who pays for redesign.
Point out the entrance, loading area or future building space you need to retain. A utility route can affect those uses beyond the fenced battery area. You should be able to see the whole proposed commitment before discussing a final acreage figure.
Reference: Town of Easton: site-plan review checklist hosted by Easton Utilities
Understand service work outside the battery fence
Easton’s posted tariff addresses changes to existing service and transformer installations, including customer costs and use of easements. These are service provisions; they do not establish a battery project’s final design or a price for connecting it.
Ask for a list of expected work outside the equipment pad. That might include service relocation, a new transformer area, trenching or temporary access. Separate confirmed work from items still subject to engineering review.
Have the company explain who pays the utility, who repairs disturbed surfaces and how your business or tenant keeps access during construction. If the work could interrupt existing service, ask who coordinates it and what notice you receive.
Compare the proposed work with the rights requested in the agreement. Temporary investigation and construction space should be identifiable separately from permanent routes. Ask how unused areas are released when the design settles or the project stops.
Reference: Easton Utilities Commission: posted electric tariff
A reviewed site plan is only one record
The Town checklist distinguishes stages of plan review and calls for preliminary drawings to be marked for review only. A drawing submitted for comments is not the same as a final approval for the battery or its electrical operation.
Ask which office has jurisdiction over the actual parcel and what decision the project needs. Do not apply a Town checklist to land outside the Town simply because it has an Easton mailing address. Keep planning review and utility connection review identified separately.
Request the written decisions and the drawings they cover as the proposal advances. Note unresolved conditions, later submissions and any changes to access or equipment. If the developer describes a project as approved, ask what remains before it can build and operate.
Compare that remaining work with your option deadline. Decide how much time the company can hold the property, what extensions cost and what evidence you receive before an extension. A public review schedule does not automatically set your private payment terms.
Reference: Town of Easton: site-plan review checklist hosted by Easton Utilities
Plan for a tenant or account change
The utility’s posted change notice expressly concerns a new account holder adopting an interconnection agreement for an existing solar system. It asks for former and new account names and whether the applicant owns the property. It is not a general battery-transfer form.
If a tenant holds the account, discuss what happens when that tenant leaves. Who maintains project service, who pays outstanding charges and what must the utility approve? Ask the developer to confirm the process for this battery rather than assuming the solar form answers it.
A property sale can also involve several separate transfers: title to the land, the project company’s lease rights, equipment ownership and the electric account. Have your advisers identify which notices and consents each requires.
Keep a current project contact and a copy of the relevant connection agreement with your land records. If the operating company changes, request updated contacts and confirmation of responsibility for payments, maintenance and removal. A company-name change should not leave you guessing whom to call.
Reference: Easton Utilities: Maryland interconnection change notice for existing solar
Send the location to start a property review
Use the form on this page to send your name, email and phone number, then the property location. Mention Easton Utilities if it is the electric provider. If it is not known, say so. You can inquire without a parcel number or exact acreage.
Add the current use, any tenant or existing solar, and the part of the property you might offer. Mention an existing developer proposal if there is one. A short description of the entrance or land you need to retain is also helpful.
The inquiry asks Sunland to review the information and discuss next steps. It does not submit a utility application, transfer an account, reserve grid capacity or commit the land. Project fit, the connection and approvals still need to be established.
Questions landowners ask
Does an Easton Utilities solar form approve a standalone battery?
No. Ask the utility to confirm the process for the battery’s actual charging, exports and connection arrangement.
What if my tenant pays the electric bill?
Identify the account holder separately from the landowner. Ask who would hold the project account and what happens if the tenant leaves.
Does a site-plan review establish available electric capacity?
No. Site layout and utility connection are separate questions. Request the decisions and drawings for each.
Do I need a parcel number to contact Sunland?
No. Send the property location and your contact information. Acreage and parcel number are optional.
Sources & further reading
Sources checked 2026-10-07. Local rules and program details can change. Check the requirements for the actual project.
- Easton Utilities: solar, net metering and linked application forms
- Easton Utilities Commission: posted electric tariff
- Town of Easton: site-plan review checklist hosted by Easton Utilities
- Easton Utilities: posted Maryland Level 2–4 interconnection application
- Easton Utilities: Maryland interconnection change notice for existing solar