Start with the whole area the project would use
A developer may describe the area occupied by battery cabinets. Ask whether the quoted acreage also includes fencing, screening, gates, drainage work and space for construction. Those features can change how much land remains available to you.
Mark the uses you need to preserve: a field entrance, a turning area for farm equipment, a tenant’s access or a future building location. A row of trees might fit on the plan but interfere with a route you use every week. Resolve that on the drawing before it becomes part of the agreement.
Request a clear boundary for each permanent right and temporary work area. Ask whether compensation covers the entire reserved area or only the equipment pad. Do not leave the answer to a later acreage calculation.

What the county policy record establishes
The May 20, 2025 minutes record unanimous approval of the recommended Solar Energy System and Energy Storage System Policy. The supporting memo describes staff review of storage siting standards and commissioner review of requested modifications, while identifying the Public Service Commission’s role in modifications or waivers.
The packet’s battery checklist is labeled Draft and directs readers to the state law for exact wording. It addresses a particular statutory framework and distinguishes commercial or industrial locations. It should not be treated as a universal battery checklist or permission to build.
Ask Development Review & Permitting which current requirements apply to the proposed design and parcel. Request the current checklist, any later policy changes and the relevant filing route. If a change is needed, find out who must approve it and how that affects the agreement’s deadlines.
Reference: Worcester County: May 20, 2025 packet, policy memo and battery checklist, PDF pages 92 and 96 · Worcester County: May 20, 2025 minutes, policy approval on page 4 · Worcester County: Development Review & Permitting resources
Decide who maintains the screening
The packet’s storage checklist discusses four-season screening, fencing, grading and topsoil. Use the actual project requirements to work out the ongoing jobs, rather than treating landscaping as a one-time installation.
Ask who buys and installs the plants, waters them while they establish and replaces them if they die. Identify who pays for mowing, invasive-species control and repairing a damaged fence. If someone must enter your retained land to do that work, show the access arrangement.
Get an answer for a transfer as well. A new operator should know what it must maintain, where it can enter and whom you should call about damage. Ask how those obligations would continue if the company holding the lease changes.
For example, if screening sits between the project fence and a working field, clarify whether your tenant may farm up to it and who restores damage caused by maintenance vehicles. The plan and agreement should describe the same boundary.
Reference: Worcester County: May 20, 2025 packet, policy memo and battery checklist, PDF pages 92 and 96
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landKeep proposed changes in front of you
Ask to receive a revised drawing if the battery layout, entrance or screening area changes during review. A change that improves the project’s permit application may still affect a use you planned to keep.
Separate permission to investigate from permission to occupy or alter the land. Confirm what surveying, soil testing or access is allowed, when you receive notice and who repairs disturbance. Providing property information to Sunland does not authorize a public application.
If the proposal depends on a modification, ask what happens if it is refused. Would the project move within your property, need more acreage or end? Agree on how a changed layout would be accepted and priced, and when reserved rights would be released if the proposal stops.
Ask what each bond actually covers
The county’s zoning page describes financial security for certain site improvements and other work, with bonds tracked by its Administrative Division. That general description does not establish the bond terms for a particular battery project.
Request the actual security documents for the proposal. Identify the beneficiary, covered work, amount, renewal terms and conditions for release. A public improvement bond should not be assumed to secure your rent, damage reimbursement or every removal obligation.
Keep a separate list of promises made to you: repair the field entrance, restore a work area, replace damaged crops or remove equipment at the end. Ask where each promise is recorded and what support remains if the operating company cannot perform it.
Reference: Worcester County: zoning review and financial security responsibilities
Connect the review schedule with your payment dates
Have the developer explain which approvals and electrical studies remain, then compare those steps with the proposed option period. Know the payments during investigation, the cost of an extension and the event that starts full rent.
If the drawing needs another review, discuss whether that extends the reservation automatically or requires a new agreement. You should be able to identify the last date the property can remain tied up and what happens to recorded documents afterward.
A county policy or nearby solar proposal does not establish a battery buyer, an available connection or a rental rate for your property. The proposal must have its own commercial and electrical review.
Send the property location to start a review
Begin with your name, email and phone number, then the location of the land. Worcester County and Maryland are selected in the form and can be changed. Approximate acreage and a parcel number are optional.
Mention an existing tenant, solar agreement, preservation restriction or offer if you know about one. You do not need a finished site plan to contact Sunland. We can review the information supplied and identify what would need to be checked next.
Include the actual municipality if known. A postal town name alone does not establish whether county or municipal rules control the parcel. An inquiry does not reserve your property or commit you to a sale or lease.
Questions landowners ask
Does the 2025 policy vote approve my land for batteries?
No. It records a policy decision, not a permit for your parcel. Ask for the current review route for the actual design.
Should the leased area include screening?
Have the drawing and proposed agreement explain every permanent and temporary area, including who maintains the screening and what compensation covers.
Does a county bond guarantee my rent?
Do not assume so. Check its beneficiary and covered obligations, and address private payments separately in the agreement.
Can I inquire without a parcel number?
Yes. Start with contact information and the property location. Acreage and parcel details are optional.
Sources & further reading
Sources checked 2026-10-06. Local rules and program details can change. Check the requirements for the actual project.