Check the date and category of the proposal
The published ordinance appendix identifies the storage amendment as Ordinance 2025-12, adopted October 23, 2025. It includes Tier-2 storage provisions in Section 6.1.6. The PDF cover states December 2025, while its appendix contains an April 2026 entry. Ask for any later adopted changes applicable to your project.
Tell the team whether the proposal is a separate battery site, equipment serving your own use or storage added to an existing energy project. Ask it to identify the category, governing office and current rules for the actual location. Do not select a project category simply because an offer uses the word battery.
Use the linked county hearing records to ask for the relevant case number and final documents. Keep the date of the rule or decision with the offer. The discussion here helps you request the right information; it does not establish approval of your parcel.
Reference: Champaign County: published zoning ordinance, storage application and plan provisions · Champaign County: Zoning Board of Appeals meeting records

Ask what the early application leaves to later design
The published application provisions describe the technology, connection capacity, maximum occupied area and proposed equipment. They allow some equipment details to differ at the later zoning-use stage while retaining stated limits tied to the special-use approval. The later application includes updated information and an electrical diagram.
Ask the developer to mark the parts of its drawing that are preliminary. Which equipment has been selected? Is the number of enclosures settled? Are the road, cable route and screening in their intended locations? Find out who will send you the updated drawing and when.
An early offer might show equipment in one corner of a field without showing the temporary work area. Ask whether the later construction design could use the adjoining area for deliveries, storage or turning vehicles. Discuss that use before agreeing that the proposed rent covers everything.
Compare the change with the private agreement as well as the public approval. A design that the public review allows may still need an explanation of the land rights, access or payments the developer is requesting from you.
Reference: Champaign County: published zoning ordinance, storage application and plan provisions
| Drawing or document | What to compare |
|---|---|
| Offer sketch | The area you are willing to consider |
| Special-use plan | The proposal submitted for public review |
| Later construction drawing | Changes to equipment, roads and electrical routes |
| Agreement map | The permanent and temporary rights requested |
Keep the whole property in the drawing
The published site-plan provisions include adjoining properties, access, wiring, screening, fencing and dimensioned separation from buildings.
Add the features that matter to your use of the land: the house, farm buildings, tenant access, field entrances and any route you need to keep open. Ask the team to show how you would reach the land outside the battery boundary.
If you intend to build, divide or sell part of the property later, raise that plan before signing. Ask whether the reservation, a cable route or another recorded right would affect it. The useful answer is a map and an explanation of the requested rights, rather than a promise that the battery occupies only a small area.
Where a separation or waiver is part of the proposal, ask which current provision applies and who must agree. This guide does not turn the dated PDF’s numerical setbacks into a current eligibility test.
Reference: Champaign County: published zoning ordinance, storage application and plan provisions
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landInclude construction access in the payment discussion
Ask for the route used by delivery vehicles, the proposed entrance and any work needed on a lane or crossing. Identify whether the land request covers only the operating site or also the area used during construction.
Discuss planting and harvest if the surrounding land remains farmed. Ask how much notice you will receive before work, whether access will be interrupted and who documents and repairs damage. If someone else farms the land, clarify how that person will receive notices and raise a problem.
Request separate explanations of temporary use, permanent access and electrical rights. Ask which payment covers each use, when it starts and when the right ends. The construction timetable should be compared with the agreement’s timetable before you commit land to either.
Understand who handles an operational problem
The published storage text includes coordination with the local fire protection district and an emergency response plan.
Ask for the operator’s contact details and the process for reporting an access, drainage, noise or equipment concern. Find out how you would be notified of a problem that affects your property and who can explain whether an area is safe to enter.
Keep those contacts with the agreement and request updates if the operator changes. Ask what information will be shared with you during construction and operation. You should be able to report a concern without having to identify its technical cause or enter the equipment area.
Reference: Champaign County: published zoning ordinance, storage application and plan provisions
Share the location and the proposal you want explained
Start with your name, email and phone number, then the Champaign County location. If known, add the current use, available area and whether you have an offer or existing energy agreement. Property details are optional.
Tell Sunland which part is unclear: the final layout, construction access, requested rights or payment schedule. You do not need a finished design to ask about the property. An inquiry does not reserve the land, authorize an application or grant entry.
Questions landowners ask
Is the developer’s first sketch the final construction plan?
Ask which parts are preliminary and when the updated plan will be available. Compare each version with the rights and area in the agreement.
Should temporary construction land be included in the discussion?
Yes. Ask where deliveries, work areas and vehicle access would be located, how long they are needed and what payment and repair terms cover them.
Does this guide confirm my property qualifies?
No. The current rules, specific design, connection, land rights and approvals need review for the actual property.
Sources & further reading
Sources checked 2026-10-04. Local rules and program details can change. Check the requirements for the actual project.