Macomb, Illinois

Battery storage land in Macomb, Illinois

Check the city’s adopted battery ordinance and the rights requested for your land before considering a lease or sale.

Could my land work?

Macomb adopted storage standards in June 2026 that are listed separately from its older consolidated code. Start with the parcel and the office handling it. Ask how the proposed battery is classified, what approval steps apply and how the agreement protects the uses you want to retain.

Read the adopted amendment with the consolidated code

The city’s code directory lists Ordinance 26-24 as adopted June 15, 2026 and not yet codified. Its storage article addresses city limits and extraterritorial jurisdiction. Ask the responsible office to confirm jurisdiction for the parcel rather than relying on a Macomb mailing address.

If a developer gives you a code excerpt, ask whether it includes the adopted amendment and any later changes. Keep the actual ordinance, dated office correspondence and proposed plan together. An older consolidated chapter should not be used to explain a new battery proposal without checking the later legislation.

Include any application already filed for your property. Ask what design and rights it covers, and whether the new proposal would be a new application or a change to that record. Do not assume that a prior solar or building approval settles every storage question.

Reference: City of Macomb: code and adopted ordinances not yet codified · City of Macomb: adopted Ordinance 26-24, June 15, 2026

Model landscape illustration of battery enclosures, an electrical substation and a proposed site layout.

Ask what kind of battery is being proposed

The amendment distinguishes accessory and standalone storage as well as Tier 1 and Tier 2 systems. Have the project team explain its actual design and the applicable review route. The category should describe what the equipment does, not simply how compact it looks.

Ask what would charge the battery, where power would go and whether an existing building or solar facility is involved. Identify who would own the equipment and who would operate it. Those answers help you understand whether this is a separate land project or an addition to something already on the property.

For example, leasing an unused corner for a grid-serving project is a different arrangement from buying a battery for your own business. Ask which situation the proposed terms describe. Do not infer that your business would receive backup power unless the design and agreement expressly provide it.

Reference: City of Macomb: adopted Ordinance 26-24, June 15, 2026

Compare the reserved land with your everyday use

The amendment addresses site plans, screening, access, roads and drainage. Ask the designer to show those elements alongside the equipment and the land you want to retain.

Mark entrances, tenant routes, loading areas, farm access and future building plans. Ask whether construction staging or electrical lines would use land outside the permanent battery area. If the project needs rights from a neighbor, identify who secures them and what happens if they cannot be obtained.

Imagine that trucks currently cross an open area to reach your building. A proposed battery layout should show how those deliveries continue. If a shared entrance is suggested, discuss gates, construction traffic, maintenance visits and emergency access before choosing the area you could offer.

Reference: City of Macomb: adopted Ordinance 26-24, June 15, 2026

Show on the planAsk before reserving the land
Current access and deliveriesWhich routes remain available to you?
Battery and electrical routeWhat permanent and temporary rights are needed?
Drainage and retained fieldsWho locates infrastructure and repairs damage?
Future buildings or tenantsWhat restrictions would affect later use?

Want to ask about your land?

Send the location and what you know. You don’t need a project plan.

Tell us about your land

Keep maintenance and damage responsibilities clear

Ask who maintains roads, gates, fencing and vegetation, and how you report a problem. Compare the agreement with the proposed public approval conditions. A promise that the project will be maintained should identify a responsible company and a practical way to reach it.

Share drainage records and known trouble spots before allowing investigations. Ask how existing conditions would be recorded and how damage would be repaired. If a tenant or farm operator uses the land, include their access and seasonal needs in the discussion.

Find out whether inspections or operational visits could cross land you retain. Ask how you would receive notice and what limits apply. These day-to-day rights deserve attention alongside the annual payment.

Read removal provisions before giving a waiver

The adopted article includes a removal plan, financial assurance, abandonment provisions and a landowner waiver concerning underground electrical wires. Ask your reviewer to explain the applicable duties and any waiver before signing.

Request the removal plan and cost estimate. Ask who funds the work, who can claim the assurance and what happens if the operator stops responding. Discuss soil, drainage, foundations, cables and roads separately; removing the visible containers does not describe all restoration work.

If you are asked to let something remain underground, have its location, depth, ownership and effect on future use explained. Ask whether the choice would affect a later buyer or building project. Keep a copy of the map and final document rather than relying on a verbal description.

Review option expiry and project termination too. Ask when rights end if approvals or the connection cannot be obtained, and who records any necessary release. The public removal plan and your private agreement should be reviewed together.

Reference: City of Macomb: adopted Ordinance 26-24, June 15, 2026

An inquiry can begin with basic property information

Send Sunland your contact details and the location. Add Macomb, McDonough County, the current use and the area you could consider. Mention any existing solar facility, tenant, application or offer if relevant.

You do not need to identify a legal tier or prepare a site plan before reaching out. Further review must establish the actual rights, design, connection, approval route and commercial interest. Sending an inquiry does not grant permission to file, test or occupy your land.

Questions landowners ask

Does the consolidated code include every adopted storage change?

The directory lists the June storage ordinance separately as not yet codified. Check the amendment and any later changes for the proposal.

Does a Macomb mailing address establish city jurisdiction?

No. Ask the responsible office about the parcel, including any claimed extraterritorial jurisdiction.

Should I sign a waiver for underground wires without a map?

Ask for the location and practical effects, and have the proposed waiver reviewed before signing.

Sources & further reading

Sources checked 2026-10-04. Local rules and program details can change. Check the requirements for the actual project.