DeKalb County, Illinois

Battery storage land in DeKalb County, Illinois

Use DeKalb’s later storage amendment when reviewing a proposal, and ask what a permit application, drainage plan or waiver would mean for your land.

Could my land work?

DeKalb County approved a sustainable-energy amendment in May 2026, later than the update date stated on its general code page. Ask the project team to use the adopted amendment and confirm the rules for the actual property. Review the proposed boundary, permission to apply, drainage and removal funding alongside the option or lease.

Read later amendments alongside the code

The county ordinance register lists O2026-007 as approved on May 20, 2026. Its general code directory still states an update through February 2026. The May document replaces the energy-storage provisions; relying only on an older code download can miss that change.

Ask the developer which version it used and whether any later amendments affect the proposal. Keep the document date with your notes. If you already received an offer based on the 2023 battery ordinance, ask for an updated explanation of the review path and proposed layout rather than assuming the earlier advice still applies.

Reference: DeKalb County: approved 2026 ordinances · DeKalb County: code directory and stated update date · DeKalb County: adopted Ordinance 2026-007, including storage provisions

Model landscape illustration of a rural parcel and the area available for a battery storage project.

Confirm the use category and governing authority

The amendment concerns unincorporated county land and separates private accessory storage from its larger energy-storage provisions. Storage associated with commercial solar or wind is treated separately in the definition. Have the team identify the category and office for the actual design.

Describe whether the proposal is a separate battery project, equipment serving an existing business or an addition to an existing energy site. Share the parcel location and any current agreement. Ask what the developer would need to change if the category or governing authority differs from its initial assumption. You should not have to calculate an electrical rating to submit an inquiry.

Reference: DeKalb County: adopted Ordinance 2026-007, including storage provisions

Understand permission to apply before signing it

The storage application provisions address owner acknowledgment when the applicant does not own the land. If the developer requests your signature, ask to see the proposal it plans to submit and the exact permission the document gives.

Compare that request with any option, entry rights and map already discussed. Ask who is authorized to represent the proposal, how you will receive application changes and whether the requested permission is limited to a particular layout. Permission to seek review, the land agreement and final approval need to be explained separately.

For example, you may be willing to discuss a corner of a field but want to keep the existing farm lane. Before authorizing an application, check that its drawing shows that lane and the area you intend to retain. Ask how your approval of a revised boundary would be handled.

Reference: DeKalb County: adopted Ordinance 2026-007, including storage provisions

Document or requestQuestion before signing
Application authorizationWhich proposal am I allowing the team to submit?
Reserved-area mapDoes it match the land I could offer?
Setback waiverWhat right changes, and how is it recorded?
Option extensionWho can extend it, and what is paid?

Want to ask about your land?

Send the location and what you know. You don’t need a project plan.

Tell us about your land

Discuss drainage before the site is changed

The amendment addresses farmland drainage, repair and agricultural damage. Ask for the proposed drainage plan and how existing conditions will be documented. Include any tile map, drainage-district information or history of wet areas you already have.

If you keep farming the remaining land, explain how water moves through both the reserved area and the retained fields. Ask who investigates a blocked tile, who arranges repair and how crop damage would be documented. Discuss access for that work as well as access to the battery.

A useful owner note might say: “The field drains toward the southern ditch, and the tile location is uncertain. I need to keep the lane open during harvest.” That identifies work the design team needs to investigate without asking you to produce an engineering solution.

Reference: DeKalb County: adopted Ordinance 2026-007, including storage provisions

Have any waiver and removal arrangement reviewed

The storage text includes recorded-waiver provisions and a decommissioning plan with financial assurance. Ask your reviewer to explain the requested documents for your property, including what survives a sale and how removal funding is maintained.

If a waiver is requested, put the affected boundary or neighboring use on the drawing. Ask why the design needs it, what changes if the equipment moves and what happens if the project is never built. Do not assume that accepting rent explains the effect of a separate recorded document.

For removal, ask who prepares the estimate, who can use the security and how you would learn about a lapse or change. Discuss foundations, cables, soil, drainage and roads, including anything you would prefer to retain. Keep the operator’s current contact details with the agreement.

Reference: DeKalb County: adopted Ordinance 2026-007, including storage provisions

Match the option period to the remaining work

Ask for a list of completed and remaining steps: property rights, local review, site design, electrical studies and any other approvals the team identifies. Beside each step, write the evidence available and the date expected. A hearing recommendation should not be described to you as a final construction decision.

Request the payment schedule for investigations, construction and operation. Find out what starts rent, who can extend the reservation and what happens if a needed step cannot be completed. A county storage rule does not establish utility capacity or determine your compensation.

Start your Sunland inquiry with contact details and the location. Add DeKalb County, current use, available area and any received offer if known. Property details are optional. An inquiry does not grant entry, authorize an application or reserve the land.

Questions landowners ask

Is an older county code PDF enough to review a new proposal?

Check later adopted amendments. The county’s May 2026 energy amendment is later than the update stated on its general code page.

Should I review a document allowing the developer to apply?

Yes. Ask which proposal it covers, what authority it grants and how changes will be shared with you.

Does the county amendment guarantee a battery project on my land?

No. The applicable rules, rights, layout, connection, costs and approvals still need review.

Sources & further reading

Sources checked 2026-10-04. Local rules and program details can change. Check the requirements for the actual project.