Lee County, Illinois

Battery storage land in Lee County, Illinois

Before reserving land for battery storage, ask what the proposed boundary includes and how a later change would be handled.

Could my land work?

Lee County lists its energy-storage ordinance as adopted June 25, 2026. For an owner reviewing an offer, the proposed land area matters from the start. Ask for a drawing that includes equipment, roads and electrical routes, then compare it with the rights requested in the agreement. Local review and your land agreement are separate steps.

Start with the right rules for the property

The posted ordinance covers defined standalone storage outside municipal zoning jurisdiction and describes special-use and building review. Associated solar or wind storage follows a different route.

Current Illinois section 5-12024 limits county storage requirements within its scope and contains an exception for earlier applications. Ask the reviewing office to identify the applicable county version, state provisions and application date. This guide does not assume every posted county condition controls every new proposal.

Give the project team a parcel reference or location and ask which office reviews its actual design. A Lee County mailing address alone is not enough to answer that question. If the offer includes solar equipment, describe that combination when asking about the review path.

Ask the team to explain its assumptions in writing: the use category, zoning, proposed area and remaining approvals. You can begin an inquiry without knowing an electrical rating or having a finished survey. Identify what you know and let the team explain what still needs investigation.

Reference: Lee County: zoning ordinances and June 25, 2026 adoption · Lee County: published Ordinance 2026-06-004, energy storage systems · Illinois: current Counties Code section 5-12024

Model landscape illustration of a rural parcel and the area available for a battery storage project.

A project sale can change the timetable you were first shown

Steward Creek is a local example of solar and batteries being described together. Hexagon’s project page describes paired storage and says the project was sold to TerraForm Power. TerraForm’s February 2, 2026 announcement reports the acquisition and a two-phase development schedule. These company statements do not establish the terms of an individual landowner’s agreement.

The published schedules differ: Hexagon’s project page says construction is expected in late 2026, while TerraForm’s dated announcement expects the two phases to start in 2027 and 2028. Ask the responsible company for the current written schedule for the work on your land. Neither estimate proves construction has started or triggers your private rent by itself.

The signed county resolution records approval of the Phase Two petition on March 21, 2024. That dated public decision and the later acquisition announcement answer different questions. For an offer affecting your property, obtain the actual decision, its conditions and the current plan alongside any transfer documents. A nearby approved project does not qualify additional land.

Find out which phase would use your property and what rights the company wants while it waits. Could roads or cables be installed for one phase before the equipment on your land is built? Would the company reserve the whole offered area during that interval? Mark each use on the drawing and compare it with the payment schedule.

Have your adviser identify the company that owes each payment and duty after the transfer. Ask for notices required by your agreement, current contacts and an explanation of any guarantees that continue. The project’s public name may stay the same while the party responsible under your documents changes.

Tie payment dates to the events defined in your own agreement. If solar begins before the batteries, or one phase is delayed, what happens to rent, extensions and release of unused land? Request records showing the relevant milestone. Do not substitute a press release or a schedule for the evidence your agreement calls for.

Reference: TerraForm Power: February 2, 2026 Steward Creek acquisition and expected phases · Hexagon Energy: Steward Creek solar-and-battery project description · Lee County: Steward Creek Phase Two petition and March 2024 decision directory · Lee County: signed March 21, 2024 Steward Creek Phase II special-use resolution

RecordOwner question
Acquisition announcementWho now owes the obligations in my agreement?
Phase scheduleWhich work on my land starts each payment?
Public decisionWhich plan and conditions does it cover?
Revised land drawingWhat remains reserved while another phase proceeds?

An approval can leave work before construction

The March 2024 Phase II resolution includes supporting battery storage and conditions before building permits, including road-use, signed interconnection and drain-tile records. The older applicant narrative describes batteries as accessory to the solar project, with a separate permit needed to build them independently. These are records for that named proposal; they do not establish current permit completion or the review route for another property.

For an offer on your land, ask for a list of the tasks still needed before work can begin. Have the company identify who handles each task and which documents show it is finished. A special-use decision may leave engineering, utility and construction arrangements unresolved.

If the proposal includes solar and batteries, ask whether the battery work depends on the solar phase. Could the company install roads or reserve the battery area while it waits? Ask what you receive during that period and when unused land would be released if the battery phase does not proceed.

Before heavy equipment crosses a field, ask how existing drainage will be located and protected. Request the survey and a repair procedure that names the responsible party, the contact for reporting damage and the time allowed for repairs. Discuss access to retained fields while the work is underway.

Ask how a later equipment change would be reviewed. The Phase II resolution addresses later battery changes that increase capacity or discharge duration. For your agreement, discuss whether a replacement could require another approval, more land or a longer construction period, and whether the company needs your consent.

Keep public milestones beside your private payment schedule. A document delivered to the county does not by itself explain whether a payment is due to you. Ask the company to identify the exact event, area and evidence that your agreement uses for each payment.

Reference: Lee County: signed March 21, 2024 Steward Creek Phase II special-use resolution · Lee County: January 2024 Steward Creek Phase II applicant narrative, voluntary storage commitments

Want to ask about your land?

Send the location and what you know. You don’t need a project plan.

Tell us about your land

Separate equipment upkeep from a request for more land

The posted ordinance distinguishes capacity-maintaining upkeep from expansion and describes amendment review for specified changes.

Ask how the agreement handles replacement equipment, a larger facility and a different access route. Does the developer need another signature to use more land? Is there a separate price for an added area? Who decides whether a change falls within rights already granted?

For example, you may offer a corner of a field while keeping the adjoining lane and the rest of the field in production. If a later layout puts equipment or a cable across that lane, ask for a marked comparison with the original drawing. Discuss the effect on your retained land before accepting the change.

Keep dated copies of the offer map, application map and any approved plan. Ask who will send revised drawings to you. A public permit amendment does not by itself explain whether your private agreement allows the requested use.

Reference: Lee County: published Ordinance 2026-06-004, energy storage systems

Change proposedQuestion for the owner
Replacement equipmentWill the work stay within the agreed area?
More landWhat additional rights and payment are requested?
A different road or cable routeHow would it affect the land I keep using?
A revised applicationWhich drawing replaces the earlier proposal?

Review a setback waiver as its own document

The posted ordinance describes affected-owner setback waivers that run with the land and are recorded.

If someone asks you for a waiver, request the proposed document and a map of the affected boundary. Ask why it is needed, what design it covers and what happens if the project changes or is never built. Have your property adviser explain its effect on a future sale.

A waiver request may concern land beside the project rather than land leased for the battery. Ask whether you are being offered a lease, a separate waiver or both. Read each document with the drawing it refers to; a conversation about rental income does not answer questions about a recorded restriction.

Reference: Lee County: published Ordinance 2026-06-004, energy storage systems

Protect drainage on the land you keep farming

The ordinance calls for a farmland drainage plan, including a drain-tile survey, and addresses repair and agricultural damage.

Tell the team where water collects, where known tiles run and which ditches serve the retained fields. An old sketch or a description from the person farming the land may help identify what needs to be checked. Do not guess a tile location simply to complete an inquiry.

Ask how the team will document conditions before work, investigate a drainage problem and arrange repairs. Discuss access during planting and harvest, who receives a report of crop damage and how you will keep records of the problem. Include the tenant farmer in that discussion if someone else farms the property.

Request an explanation of drainage beyond the fenced area. A road, trench or grading change could affect how you use the surrounding field. Compare the drainage drawing with the roads and electrical routes in the land agreement.

Reference: Lee County: published Ordinance 2026-06-004, energy storage systems

Compare removal funding and the agreement timetable

The ordinance requires a decommissioning plan and financial assurance, with periodic updates. It also contains permit-expiration and project-transfer provisions.

Ask to see the removal estimate and proposed security. Who can use that funding? How would you learn about a lapse, a new operator or a revised estimate? Discuss what should happen to cables, foundations, drainage and roads, including any improvement you would prefer to retain.

Put the county-review timetable beside the option and payment schedule. Ask what starts operating rent, who can extend the option and what happens if a permit or electrical connection cannot be obtained. Request the evidence behind each claimed completed step. Neither this ordinance nor a nearby power line establishes available connection capacity or a rental price for your parcel.

Reference: Lee County: published Ordinance 2026-06-004, energy storage systems

Ask who pays project costs and who protects you

The posted ordinance addresses consulting costs, insurance and indemnification for the county. Those provisions do not explain every term of your private agreement.

Ask the company which studies, filings, inspections and other project expenses it will pay. If you are asked to advance money or accept reimbursement later, discuss the amount, timing and what happens if development stops.

Have your adviser check whether any clause passes project costs or claims to you. Compare the company’s obligations during investigation, construction, operation and removal. Make sure you understand the role you would hold in each document.

Request the insurance documents relevant to your property. Ask your insurance adviser who is covered, what activities are covered, whether protection continues through removal and how you learn of a cancellation or replacement policy.

Keep payment, damage repair and insurance questions separate. Receiving rent does not tell you how a damaged lane, drainage problem or third-party claim will be handled.

Reference: Lee County: published Ordinance 2026-06-004, energy storage systems

Keep records of what was built and restored

The posted ordinance calls for as-built records and a post-removal environmental assessment. Confirm the current project requirements and ask which records you will receive.

Ask for the final layout showing equipment, roads, cables and the area returned to you after construction. Compare it with the agreed boundary and report differences while the work is still being reviewed.

Agree on how existing conditions and completed repairs will be documented. Keep photographs, drawings and contact details together so a later drainage or access question can be tied to the work that occurred.

Before removal, discuss which improvements you want retained and how that fits the approved plan. Ask how you will check restoration, receive reports and raise an unresolved problem before land rights or security are released.

If the project company changes, request updated contacts and an explanation of who holds these records and owes the remaining duties. Keep your own copies of the current agreement and its amendments.

Reference: Lee County: published Ordinance 2026-06-004, energy storage systems

Send the location and the questions you already have

Start with your name, email and phone number, then identify the Lee County property. If known, add the current use, area you could consider and whether a developer has already made an offer. Acreage and the parcel number are optional; start with the location you know.

If you have a proposal, tell Sunland what you want to understand: the reserved boundary, expansion rights, a waiver, drainage or the payment timetable. An inquiry gives us a starting point for a conversation. It does not grant entry, authorize a permit application or reserve your land.

Questions landowners ask

Does a special-use approval mean the project can start building?

Ask which conditions and later permits remain. The historical Phase II decision includes records required before building permits. For your offer, compare actual completed milestones with the payment events in your agreement.

Can the project later expand beyond the first drawing?

Ask how both the public review and your agreement handle a changed layout. Request a comparison drawing and an explanation of any additional land rights or payment.

Is a setback waiver the same as a battery lease?

No. Ask what each document does, which property it affects and whether it will be recorded. Review the waiver separately from the rental terms.

Does county insurance language explain my own coverage?

No. Ask your insurance adviser to review the documents and the protection for you and your property at each project stage.

Who pays for studies and public review?

Ask the company to identify its project costs and have your adviser check the private agreement for any cost or reimbursement obligations you would accept.

Do I need a drainage map before contacting Sunland?

No. Share what you know about wet areas, tiles and current farming. Property details are optional; the team can identify what needs further investigation.

Sources & further reading

Sources checked October 7. The March 2024 resolution and January 2024 applicant commitments are historical project records, not evidence of current construction readiness or new land demand. Local rules and program details can change. Check the requirements for the actual project.