Peoria County, Illinois

Battery storage land in Peoria County, Illinois

Before you agree to hold land for batteries, ask the company to explain which rules apply and what its utility paperwork actually proves.

Could my land work?

Peoria County publishes battery storage provisions in section 7.19. Read them alongside the current Illinois storage law and ask the reviewing authority which requirements apply to the proposed design and application. A nearby line, a permit application or a utility review letter does not establish that your land has an approved, affordable connection.

Check who handles the parcel

Peoria County and the City of Peoria are different zoning authorities. Other cities and villages in the County also have their own zoning map layers. Start with the parcel boundary and ask which office reviews the proposed use. A mailing address is not enough to identify the authority.

The County development ordinance explains its jurisdiction in section 1.4. Have the project team check that section against the parcel rather than borrowing a rule from a neighboring municipality. Ask for the zoning designation and a written explanation of the approval route.

If several parcels are involved, show all of them on the drawing. Identify where the equipment would stand, where the road would enter and how cables would reach the connection. Different parts of a development may require different permissions.

Keep the actual decisions and conditions with the land agreement. A general description of battery rules does not show that a particular proposal has been approved.

Reference: Peoria County: jurisdiction and applicability, section 1.4 · Peoria County: zoning map layers for the County and municipalities

Model landscape illustration of battery storage sites and an electrical substation connected by roads and power lines.

Have the County and project team reconcile the local and state rules

The published County section divides batteries into tiers using stored energy measured in kilowatt-hours and, for enclosed installations, the number of units. The current state statute uses a different definition and excludes batteries associated with commercial solar or wind. Those classifications should not be treated as interchangeable.

For systems within its scope, the state law limits county requirements and addresses existing conflicting ordinances. It also distinguishes applications submitted before the effective date of the amendment. Ask which provisions control the actual proposal, including its application date. This guide does not resolve a conflict for your parcel.

Ask the company to describe both electrical power and stored energy, what the batteries would connect to and whether another energy facility is part of the proposal. A sales label such as small, DG or utility-scale does not settle the legal classification.

Before accepting an approval timeline, request the steps the reviewing office says are required. Discuss those steps separately from the company’s requested option period and extensions. You need to understand how long your land could be held even if a permit or connection takes longer than expected.

Reference: Peoria County: published battery storage rules, section 7.19 · Illinois General Assembly: current Counties Code, section 5-12024

A utility review letter is one step, not the completed connection

The published County battery section calls for a utility letter showing that interconnection review has started. That is not a statement that a final connection agreement has been issued. Ask to see the actual document and what it says.

Find out which utility or grid process the project is using, where it would connect and what remains to be studied. Has the company identified a line, submitted an application, received study results or obtained an agreement? Have it explain the stage in plain language.

Ask who pays for studies and any required equipment or network work. What happens to your reservation if the work is too expensive or the expected completion date changes? The land agreement should explain release and payment rather than relying on an optimistic project schedule.

A cable route may need rights across land outside the battery lease. Show those rights on the map and identify who must grant them. A connection point is not useful to the proposal unless the project can obtain the necessary route and approvals.

Reference: Peoria County: published battery storage rules, section 7.19

What the company showsWhat to ask next
Nearby line or substationWhich connection is being studied?
Review-start letterWhat studies and agreements remain?
Study resultsWhat work, cost and schedule do they require?
Connection agreementWhich conditions and land rights still need to be met?

Want to ask about your land?

Send the location and what you know. You don’t need a project plan.

Tell us about your land

Compare the work area with the land you would keep using

Mark the battery area, fence, roads, cable routes, screening, drainage work and temporary construction space separately. Then compare that drawing with the option, lease and any easement exhibits. A fenced equipment area can be smaller than the land subject to the company’s rights.

Show existing entrances, buildings, tenants, farming routes and future plans. If delivery vehicles need turning or waiting space on retained land, ask when they would use it, how it would affect your access and who restores damage.

Keep road-authority approval separate from permission to use your private drive. Ask the company to identify each requested right, the responsible party and the period it lasts. Discuss repair access for drainage and utilities that serve the rest of the property.

For example, you may be willing to lease a field corner while keeping a route to a building open. Put that requirement on the drawing before comparing offers. An arrangement that looks workable from an aerial photo may need a different entrance or construction plan.

Request the removal plan and the actual security document

The published County section treats batteries developed with commercial solar separately from independent batteries for removal planning. Ask which route the project relies on and obtain the documents for that design.

For independent Tier 2 batteries, the posted provisions call for a removal plan and financial security naming the County. Do not assume that a County instrument is payable directly to you or that it replaces your private agreement.

Request the plan, current cost estimate, funding instrument and County agreement. Ask who supplies and renews the security, who may use it and what must happen before it is released. A reference to a bond in a presentation is not the issued bond.

Have your adviser compare the public documents with the lease. What equipment, foundations and cables would be removed? What soil, drainage and vegetation condition would be restored? If you want a road retained for another use, have that explained in the removal scope.

Discuss the responsible parties if the project is sold, stops operating or runs out of money. Ask who handles a repair or removal complaint and what information you would receive after a transfer. Public enforcement provisions and private payment or restoration promises serve different purposes.

Reference: Peoria County: published battery storage rules, section 7.19 · Illinois General Assembly: current Counties Code, section 5-12024

Tell Sunland about the land and the decision in front of you

Start with your name, email and phone number, then the property location. Peoria County and Illinois are selected on this page; correct them if the land is elsewhere. Acreage and parcel references are optional.

Tell us what you want to keep using and whether anyone has asked for an option, lease, road or cable right. Mention an existing tenant, drainage arrangement or deadline. You can ask before you have a completed site plan or electrical study.

If a company has provided utility or approval paperwork, describe what it is and the stage it appears to cover. That helps identify the next questions without treating an application as a finished project.

Submitting an inquiry starts a discussion. It does not reserve the property, authorize entry or file an application. Any potential opportunity needs its own review of the land, connection, permissions and commercial terms.

Questions landowners ask

Does a County utility-review letter mean the connection is approved?

No. The published battery provision refers to review having started. Ask what studies, agreements and conditions remain for the proposed connection.

Are the County battery tiers the same as the state-law definition?

No. They use different criteria. Ask the reviewing authority and your project advisers which requirements apply to the actual design and application date.

Can I use the County guide for land in the City of Peoria?

Check the parcel’s zoning authority first. County and municipal rules should not be assumed to be the same.

Does the County’s removal security replace my lease terms?

Do not assume that. Review the actual security and public removal documents alongside the restoration and payment obligations in your private agreement.

Do I need a parcel number before contacting Sunland?

No. Start with contact details and the property location. Acreage and parcel references are optional.

Sources & further reading

Sources checked 2026-10-05. Local rules and program details can change. Check the requirements for the actual project.